The Field Survey Party Flashcards
responsible for the overall direction, supervision, and operational control of the survey party.
Chief of Party
assists the chief of party in the accomplishment of the task assigned to the survey party.
Assistant Chief of Party
sets up, levels, and operates the surveying instruments.
Instrument Man
keeps the record of all sketches, drawings, measurements, and observations taken in the field.
Recorder
responsible for the use and operation of all electronic
instruments required in the field.
Technician
performs all computations of survey data and works
out necessary computational checks required in the
field.
Computer
- responsible for the accuracy and speed of all linear
measurements with tape. - carries the zero end of the tape ahead
Head Tapeman
- assists the head tapeman during taping operations and in other related work.
- holds the 30-m end or any intermediate meter mark of
the tape during measurement
Rear Tapeman
- holds the flagpole or range pole at selected points as
directed by the instrument man.
Flagman
holds the stadia or leveling rod when sights are to be taken on it.
Rodman
checks all linear measurements made by the tapeman. May also perform the job of the rodman.
Pacer
clears the line of sight of trees, brush, and other obstructions in wooded country.
Axeman/Lineman
renders first aid treatment to members of the survey party who are involved in snake or insect bites, accidents and other health issues. May also be designated as assistant instrument man.
Aidman
renders other forms of assistance needed by the survey party or as directed by the chief of party.
Utilitymen