*TB 94- Asbestos Flashcards
1
Q
A permit for asbestos abatement is good for ____ days from the date of issue and only for the specific project for which it is issued.
A
180
2
Q
Asbestos multi story building:
- A standard ____ inch by ____ inch black on yellow (Per updated fire code: RED, BLACK, and WHITE) warning sign placed in the Fire Control Room adjacent to the fire alarm annunciator panel
- A ____ by ____ inch sign with minimum 3” X 1/2” lettering on a contrasting background, indicating which floors are involved in the abatement process
- An additional set of signs shall be placed on each landing in each stairwell which leads to all floors undergoing abatement beginning ____ floors below the affected floor(s) and ___ floor(s) above the affected floor
A
- 20”x14”
- 12x12”
- 2 and 1
3
Q
Division 5 Permits are obtained from the Bureau of Fire Prevention’s _____ Unit.
A
Engineering
4
Q
All asbestos projects in L.A. City over ____ square feet require an on-site inspection and a _____ permit.
A
100 sq ft
Division 5