T2P/TPC Question Bank Flashcards
T2P Requirements
(325 +/- 25 hours total time) + recommended by the APRB
TPC Upgrade Requirements
must complete a “recommend” flight prior to being nominated by the APRB
(625 +/- 25 hours)
TPC candidates will complete a 6120 with an ANI within 7 days of their scheduled 6118
Time to go through upgrade syllabus
Time to complete the prescribed upgrade syllabus (upgrade simulator events, route check, 6120, and landing check) should normally not exceed 45 days.
Up to what level risk can O-5 CO accept?
Up to Medium. High requires an O-6
Different levels of re-hacks
(1) Current instructor with expired pilot or loadmaster.
(2) Current TPC/FE with an expired TPC/FE.
(3) Current TPC/FE/ACSQ with expired copilot/ACSQ/Loadmaster
(4) Current copilot/loadmaster with expired TPC instructor/Loadmaster Instructor
(5) Current copilot/ loadmaster with an expired TPC, ACSQ or FE.
(Re-hack 4 and 5 shall be individually briefed to the CO by the FDO while getting the schedule signed.)
Severe BASH restrictions
prohibited from conducting Tactical Navigation (TACNAV), multiple approaches, and touch-and-go training without CO approval
What does PMI stand for?
Planned Maintenance Interval
When does crew duty day commence?
Starts whenever the first crewmember commences crew duties or reports to work and terminates one hour after engine shutdown at the end of a flight or series of flights. If an aircrew member performs duties to include maintenance or cargo handling in excess of one hour after engine shutdown, crew rest begins at the completion of such duties. For operations away from home station, crew day will commence at the show time designated by the AC at the airfield, and crew rest will begin upon leaving the airfield.
How long for crew rest?
mission planners should plan to provide 12 hours of off-duty time for all crewmembers between missions. All crewmembers shall be afforded the opportunity to eat a meal and have eight hours of uninterrupted sleep.
Delays of how long require FDO/SDO notification
60 mins
When do you need CO approval to take off heavy?
Above NATOPS max normal takeoff (164,000lbs)
LOX requirements? Overwater?
10 liters of LOX departing homestation, 18 liters leaving homestation if overwater.
What constitutes a VIP flight?
Level 7 or above