T2P/TPC Question Bank Flashcards

1
Q

T2P Requirements

A

(325 +/- 25 hours total time) + recommended by the APRB

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

TPC Upgrade Requirements

A

must complete a “recommend” flight prior to being nominated by the APRB

(625 +/- 25 hours)

TPC candidates will complete a 6120 with an ANI within 7 days of their scheduled 6118

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Time to go through upgrade syllabus

A

Time to complete the prescribed upgrade syllabus (upgrade simulator events, route check, 6120, and landing check) should normally not exceed 45 days.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Up to what level risk can O-5 CO accept?

A

Up to Medium. High requires an O-6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Different levels of re-hacks

A

(1) Current instructor with expired pilot or loadmaster.
(2) Current TPC/FE with an expired TPC/FE.
(3) Current TPC/FE/ACSQ with expired copilot/ACSQ/Loadmaster
(4) Current copilot/loadmaster with expired TPC instructor/Loadmaster Instructor
(5) Current copilot/ loadmaster with an expired TPC, ACSQ or FE.
(Re-hack 4 and 5 shall be individually briefed to the CO by the FDO while getting the schedule signed.)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Severe BASH restrictions

A

prohibited from conducting Tactical Navigation (TACNAV), multiple approaches, and touch-and-go training without CO approval

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does PMI stand for?

A

Planned Maintenance Interval

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When does crew duty day commence?

A

Starts whenever the first crewmember commences crew duties or reports to work and terminates one hour after engine shutdown at the end of a flight or series of flights. If an aircrew member performs duties to include maintenance or cargo handling in excess of one hour after engine shutdown, crew rest begins at the completion of such duties. For operations away from home station, crew day will commence at the show time designated by the AC at the airfield, and crew rest will begin upon leaving the airfield.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How long for crew rest?

A

mission planners should plan to provide 12 hours of off-duty time for all crewmembers between missions. All crewmembers shall be afforded the opportunity to eat a meal and have eight hours of uninterrupted sleep.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Delays of how long require FDO/SDO notification

A

60 mins

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When do you need CO approval to take off heavy?

A

Above NATOPS max normal takeoff (164,000lbs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

LOX requirements? Overwater?

A

10 liters of LOX departing homestation, 18 liters leaving homestation if overwater.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What constitutes a VIP flight?

A

Level 7 or above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly