System Testing Flashcards

1
Q

Testing of plumbing system is a requirement of the

A

Ontario building code

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The most common test for DWB systems is the

A

Water full test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The requirements and procedures for the testing of potable water, as well as drain waste and vent can be found in

A

Part seven section 3 of the OBC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The only portion of the storm drainage system that does not require testing is

A

An external leader

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The final test may be required at the discretion of

A

The chief building official

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A final test is conducted

A

After all fixtures are installed, and before any portion of the drainage and venting system is placed into service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

A ball test is carried out to ensure that…

A

The building sanitary or storm drain and sewers are installed with even fall and there are no gaps in the joint make up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A final test is a type of…

A

Air

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The minimum height of a section of a DWI system being water tested is

A

3000 mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The minimum time duration of a water test on a DW system is

A

15 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The minimum pressure for an air test on a DWP system is

A

34.5 KPA (5.1 psi)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The minimum pressure for final test is

A

25 mm (1 inch water column)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The ball to be used in a ball test must be dense enough

A

Not to float

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The minimum size of ball to be used when conducting a ball test is

A

2 inch /50 mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Potable water must be tested…

A

Either as a whole system, or in sections as installation permit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Pre-fabricated section of a plumbing system may be

A

Tested and inspected as a whole

17
Q

The minimum pressure and duration for hydrostatic test on a portable water system is

A

1000 KPa (145 psi). For 60 minutes.

18
Q

The minimum pressure and duration for an air test on a portable water system is

A

700 KPa (102 psi) for 120 minutes

19
Q

Fluids used to perform a hydrostatic test on a portable system and a temperature below 32°F is

A

Portable water

20
Q

Final test on a DWV system can be conducted by using which fixture

A

Water closet

21
Q

The only part of a drainage system that is never tested is

A

Fixture outlet pipe

22
Q

When conducting a final test on a DWB system, the fixture trap must be

A

Filled with water

23
Q

When testing the WV systems that include floor drains care should be taken to

A

Ensure that the trap seal primer lines are capped