System Operations - A Flashcards
Each system, Balancing Authority, and Region is responsible for maintaining a set of current plans which are designed to evaluate options and set procedures for reliable operation through a reasonable future time period. This set of plans must include all of the following EXCEPT:
A. Emergency Operating Plan
B. Normal Operating Plan
C. System Restoration Plan
D. A Back Control Center
D. A Back up Control Center
After load forecast is completed, the generating units should be assigned by unit commitment to meet foretasted load
A. Reserve obligation, and energy transfers
B. Losses, reserve obligation, energy transfers, and entity requests
C. Losses, reserve obligation, and energy transfers
D. And reserve obligation
D. And reserve obligation
Of the following possibilities, which is a GMD most likely to cause?
A. A frequency excursion
B. A transmission line de-rating
C. Transformer overheating
D. An increase in generator MW output
C. Transformer overheating
Because of the importance of telemetered data, it is imperative that they system operator ensures that the values are verified
A. Every shift
B. Only when an alarm is received
C. Every Hour
D. Continuously
D. Continuously
A positive MW or MVAR value on the high side of a transformer means the flow is
A. Out of the high side of the transformer
B. Into the high side of the transformer
C. Into the generator
D. Into the low side of the transformer
.A Out of the high side of the transformer
Acceptable types of spinning reserve are
A. On-line generation loaded less than full capability
B. Interruptible load, imports or exports
C. On- demand rights for other entities or Balancing Authorities
D. Off-line generation that can respond to demand within 10 minutes
A. On-line generation loaded less than full capability
A SMD can cause
A. Transformer overheating
B. Relay operation
C. Frequency excursions
D. Transmission line de-rating
A. Transformer overheating
In a case of sabotage intended to increase a power system’s vulnerability, the DOE requires a report within
A. 15 minutes
B. 6 hours
C. 12 hours
D. 24 hours
D. 24 hours
A system operator must obtain permission from which of the following before they manually shed load?
A. Reliability Coordinator
B. Utility Management
C. No permission is required
D. NERC Representative
C. No permission is required
All systems must be operated in a manner that will limit the likelihood of:
A. Loss of load due to multiple outages
B. Cascading outages as a result of a single contingency
C. Frequency deviations due to loss of generation
D. Balancing Authorities responding to external disturbances
B. Cascading outages as a result of a single contingency
Electric System Security Data has to be updated every ____
A. 6 minutes
B. 20 minutes
C. 10 minutes
D. 30 minutes
C. 10 minutes
In order to predict the power system’s near term load pattern, a system operator must have information including weather forecasts and ____
A. Protected load pattern
B. Reactive metering
C. Past load patterns
D. Generator overhaul schedules
C. Past load patterns
A Balancing Authority is considering building a backup control center. Which of the following statements should be true with respect to this backup control center?
A. The backup control center should be remote from the primary control center site
B. The back up control center does not require access to the Balancing Authorities EMS system
C. The backup and primary control centers should be in the same location to facilitate easy movement between the two centers
D. The back up control center must be in a rural area
A. The back up control center should be remote form the primary control center site
A system operator’s certification date must be accurately recorded to:
A. Track emergency operations training
B. Determine when the operator is eligible for a salary increase
C. Determine when the system operator needs to retake the Certification Test
D. Monitor the individual’s certification status
D. Monitor the individual’s certification status
Each Balancing Authority shall have ____ for when there is a loss of telecommunications.
A. Redundant systems
B. Data recorders
C. A plan
D. Satellite Phones
A. Redundant Systems