Supression Emergency Flashcards
On a Haz-mat scene, heat stress monitoring is mandatory if above what temp?
70 degrees F
CO monitoring a level of 35-180 PPM will have how long to evacuate?
0-35 (8 hrs)
35-180 (15 min)
180+ (SCBA)
On a high-rise incident, a base will be established where?
200 feet from the building
High-rise, Staging is how many floors below the fire floor?
3 (three) floors below
As a rule how many Fire fighters on an elevator?
6 (six) personnel
What are the types of elevator keys?
Lunar, t-slot, drop key
When refilling SCBA how much water should a fire fighter drink?
8oz for water
What do hydraulic elevators have that electric elevators don’t have?
A Lowering Valve
On accident form, what copy goes to risk management?
Top Copy
Elevators installed after 1976 and over 70 ft tall must have what phase?
Phase two
Decon is located in the ____ zone.
Warm zone
Evacuation distance for clandestine drug lab.
Residential-1 house in all direstions,
Apts-All connecting apts,
Highway-150 ft in all directions,
Commercial-building involved
Which company will be assigned to search attack stairwell?
3rd rescue ladder company
Any building with the ability of a fire over___ floors is considered a high rise.
5th floor
The fire attack stairwell must be cleared of occupants for a minimum of___ floors above the fire floor before commencing attack.
5 (five) floors above five floor
A minimum of_____ divers is required.
5 (five) divers
Employees should consume how many ounces of water per hour?
32oz per hour
Who is responsible for damage to private property?
Company Officer
Elevator car travelling over 3 stories must have a________.
Vented hoistway
Who will be notified of damage to private property?
District officer and home owner
Do not take cardon monoxide monitors into areas greater than what temp range.
100 deg F or below 0 deg F
Do not move a body until the______ has finished their task.
Medical Examiner
Actual physical violence against property and human life on a large scale is a.
Level 2 response
Who has primary responsibility for pt care?
EMSA
What is performed by every company officer on every incident?
Size-up
In the ISO manual the Hazmat/Water and special operations guides are printed on what color pages?
Pink pages
It is the responsibility of who, to remove banner guard?
IC or designee
High rise, The first two engines and first rescue ladder company will consitute the>
Investigation group
Up to how many floor will escalators span?
1-3 floors
Which elevators use electric motors?
Both electric and hydraulic
Hydraulic elevator are different from electric how?
Do not have a brake
At what body temp should an employee rehabilitation time be increased?
100.6 degs
Recommended guidelines for length of a sake work zone on roads.
25mph-55ft, 35mph-120ft, 45mph-220ft, 55mph-335ft, 65mph-485ft.
On structure fires dispatch will automatically dispatch a company of at least____ personnel, specifically for RIT.
3 (three) personnel
Landing zone for medi-flight must be how big?
100 X 100ft
Blue cones are for which zones?
Support
Highrise, Who is typically responsible for the 1st FDC?
4th Engine
Which is the type of manual elevator control used in OKC?
Independent Service
A temporary location where personnel and equipment are kept awaiting assignment?
Staging
Helicopter should land at least____ yards from the scene?
50 yards
All personnel within____ of water will wear PFD.
10 (ten) feet
Elevator cars traveling over how many stories must be in a ventilated shaft?
3 Stories
It is well documented that typical fire department centrifugal pumps operate at their highest GPM flow at what pressure?
150 PSI
What phenomenon causes smoke to move down in a high-rise building?
Inverse stack effect
Elevaters in buildings over 70 feet tall installed after what year must have fireman’s emergency return (second phase) feature?
1976
What comprises the investigation group?
2 engines, 1 ladder
Situational awareness involves?
Being aware of your sorroundings
The chief of ops. will ascend to what floor and establish the operations post?
2 floors below the fire floor