016- When the FM will Automatically Reset Itself?
PRO-SUP-22-10 P1
When the FM Software Cannot Work Properly
Or
The FM Receives Instructions to Perform Impossible Operations.
017- What are the possible FM Soft Reset in Case of Erroneous Predictions?
PRO-SUP-22-10 P 10
- Check the CRZ TEMP (Sign and Value),
- Check the Gross Weight and the Cruise Flight Level
- RE-ENTER the Same Cost Index to Restart a Computation
(On DESC or APP, this will NOT Restart a Computation)
- MAKE a COPY ACTIVE, then Activate the Secondary
- MAKE a “DIR TO” to the “TO” waypoint.
018- What to do if a Spurious Engine-Out is Detected?
PRO-SUP-22-10 P10
PRESS the EO CLR Prompt of the MCDU PERF Page
RE-ENGAGE Previous Vertical Mode
RE-ENTER Preselected Speeds (If Any).
019- What the Meaning of “CHECK GW” Message If the FMS GW on the MCDU is Correct?
PRO-SUP-22-10 P11
It Means the Characteristic Speeds Computed by the FAC
(VLS, F, S, GREEN DOT on PFD) are Not Correct
Use the QRH Operating Speeds (QRH/PER-A Speeds).
020- In which Cases the FMGC RESPONSE to a Failure will be:
TOTAL Loss of A/P & A/THR?
PRO-SUP-22-10 P16
- 2 ADC Failure (Air Data Computer)
- 2 FAC Failure (Flight Augmentation Computer)
- 2 IRS Failure (Inertial Reference System)
- 2 LGCIU Failure (Landing Gear Control Interface Unit)
- 2 SFCC Failure (Slat/Flap Control Computer)
- Total Loss of the FCU (Flight Control Unit)
In ALL Cases Above, the Results will be to Fly:
–> RAW DATA.
021- In which Cases the FMGC RESPONSE to a Failure will be:
TOTAL Loss of A/THR but A/P OK?
PRO-SUP-22-10 P17
- Loss of One FADEC (Full Authority Digital
Engine Control)
- Loss of EPR (Engine Pressure Ratio).
022- What kind of Content is under SUP-22-20 FMGS Specificities?
PRO-SUP-22-20-10 FMS1 Honeywell Specificities
PRO-SUP-22-20-15 FMS2 Honeywell Specificities
PRO-SUP-22-20-18 FMS2 Thales/GE Specificities
PRO-SUP-22-20-20 FG Specificities.
023- What defines the Navigation Database Validation to Perform an Approach?
Navigation Database must be Either:
- Produced by a Supplier Compliant with ED76/DO200A
OR
- Validated and Approved by the Operator.