Standby Gas Flashcards

1
Q

What’s the purpose of the recirc fans?

What ratio is it mixed at?

A

Mix a quality of air from enclosure building with air from lower regions of the Aux building

> 3:1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What’s the power supplies for the recirc fans?

A

15BA3

16BB3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How do dampers respond after initiation?

A

F021/F022 are open on initiation and remain open ( Enclosure bldg to recirc fans)

At -.20” wc is reached, aux steam tunnel F005/F006 go to intermediate

90 seconds later all other dampers go to intermediate

If enclosure building >.20”wc, dampers re-open

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What will trip the heater in SBGT?

A

> 200 deg F (auto reset)

> 225 deg F (manual reset)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What setpoints will start the standby, SBGT?

A

< 8500 scfm running enclosure building recirc fan low flow

<1250 scfm running exhaust filter train low flow

> .20” wc in enclosure building low negative pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How do you place a train of STBY gas in standby?

A

IF:
> 8500 scfm running enclosure bldg recirc fan
> 1250 scfm running exhaust filter train flow
> .20” w.c. in enclosure bldg pressure

THEN:
Mode switch to STBY
amber light
reset manual initiation logic
stop SBGT train
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How do the exhaust fan vanes react off initiation? (F500A/B)

A

Initially open for 120 seconds or .75” w.c. enclosure bldg pressure.

THEN:

Modulate to maintain 3875 scfm system flow rate through the filter train

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

what signals start standby gas?

A
  • 41.6” Rx water level
    1. 23 psig drywell pressure

30 mr/hr fuel pool sweep

3.6 mr/hr FHA exhaust

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

purpose of demister?

A

removes water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

purpose of electric heater?

A

reduces humidity to 70%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

purpose of prefilter?

A

removes large particle matter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

purpose of HEPA (1st filter)

A

Removes fine particulate matter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

purpose of charcoal filter?

A

removes gaseous IODINE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

purpose of 2nd HEPA filter?

A

Collects carbon fines exhaust from charcoal beds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Will stop handswitch secure STBY gas with signal sealed in?

A

NO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the NSSSS logic?

A

A and D

OR

B and C

17
Q

How long after VOCs have been used in the Aux, CTMT, or enclosure building can standby gas be ran in nonemergency mode?

why?

A

16 hours

protect the charcoal

18
Q

What is the purpose of STBY gas?

A

Limits the environmental release of radio isotopes which can leak from CTMT or FHA boundary under accident conditions