Spp Doc 206 Flashcards
refers to the range of professional services that covers Pre-design Services, Regular Design Services, Specialized Architectural Services, Construction Services and Post- Construction Services.
Comprehensive architectural services
SPP DOCUMENT 206
Standard of professional practice on comprehensive architectural services
is the prime professional.
Architect
He functions as ____,_____,_____ of the building design which becomes the basis for the construction of a project.
Creator
Author
Coordinator
Scope of comprehensive architectural services
Pre-design services
Regular design services
Specialized architectural services
Construction services
Post-construction services
involves management activities over and above the normal architectural and engineering (A&E) services carried out during the pre-design, design and construction phase.
Project management
when the Owner hires an Architect or a firm to coordinate the whole range of Comprehensive Architectural Services (CAS), this constitutes
Project Management (PM).
The over-all objective is to have control over_____, ______, and ______ relative to the construction of a project.
Time
Cost
Quality
operates as a member of an Owner-Architect-Engineer-Contractor Team.
Project manager
The Project Manager (PM, whether individual or firm) operates as a member of an
Owner-architect-engineer-contractor team
primary responsibility is the exercise of overall cost control. He will plan, program and monitor the various activities, and will act as an adviser on material costs and construction methods.
Project manager
will have prime responsibility for the plan/design of the project.
Architect and the specialist consultants
will be responsible for their respective engineering plans.
Engineers
shall be responsible for his men and equipment and the delivery of the project.
Contractor
makes decisions on the project and assures that funds are available to complete the project.
Owner