SPP 201 TO 206 Flashcards

1
Q

FULL TIME SUPERVISION SERVICES

A

SPP 204a

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

For the past _ years, _principal members were involved in the design and building construction process:

A

50 years, four principal members

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

For the past 50 years, four principal members were involved in the design and building construction process:

A
  • The Owner who orders for the implementation of a project;
  • The Architect and his Specialist Consultants (SCs) who render plan / design services and limited inspection work;
  • The Contractor who performs the construction work;
  • The individual or group of individuals who assist in the supervision and
    delivery of the work.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Directly and professionally
responsible and liable for the construction supervision of the project.

A

Architect-in-charge of construction (Aicc)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

SCOPE OF FULL TIME SUPERVISION SERVICES

A

✓ Quality Control
✓ Evaluation of Construction Work
✓ Preparation of Daily Inspection Reports
✓ Filing of documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The detailed tasks shall be as specified under the _

A

Architect’s Guidelines.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Working in a _ as Architect-of-record and as
Consulting Architect for fulltime supervision services or as the
Construction Supervision Group (CSG).

A

Dual capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

CONSTRUCTION MANAGEMENT SERVICES

A

SPP DOCUMENTS 204b

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Due to the increasing complexity of construction projects, there is an _ for more effective cost control and faster project implementation consistent
with high quality of work.

A

upward demand

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The Construction Manager (CM) could either be:

A

❑ a member of the staff of the Owner,
❑ an independent individual, or
❑ a firm hired by the Owner to manage the construction of a particular project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The Architect can serve as the _ .

A

Construction Manager (CM)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The responsibilities of the Construction Manager (CM) include the functions of the _

A

Construction Supervision Group (CSG).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The Architect as the Construction Manager shall not:

A

Involve himself directly with the work of the Contractor
Impose methods, systems or designs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Directly responsible to the
Owner on all aspects of the construction work:

A

The Architect as the Construction Manager (CM)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The individual or the principal of the firm must be a _ , preferably an Architect with managerial capabilities and extensive experience in the field of construction.

A

State-regulated
professional

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Architects who are Contractors or who have already been in responsible charge of construction works are usually capable of becoming _

A

Construction
Managers (CMs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

POST CONSTRUCTION SERVICES

A

SPP DOCUMENTS 205

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Building administration and management goes _.

A

beyond maintenance and
upkeep functions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

The Architect may be engaged as the _ of a commercial, industrial, residential or institutional building, facility or complex to maximize the lifespan of the building/s in order to produce the maximum economic return.

A

Building Administrator and/or Property Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Building Maintenance. The Architect shall:

A

a) see to it that the building and all the parts thereof (structure, plumbing, electrical, partitions, finishes, etc.) are all in good condition.

b) formulate and enforce rules for the proper use of the building and facility, particularly in the common areas and the emergency/ egress/
exit areas.
c) monitor security services, and
d) monitor maintenance and upkeep services (cleanliness of corridors,
lobbies, stairs and other common areas, exits, parking areas, garbage
collection)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Grounds and Landscaping Supervision. The Architect shall:

A

a) supervise landscape contractors and gardeners for the proper watering, pruning, trimming and maintenance of the landscape (both
hardscapes and softscapes);
b) maintain orderly entrances, exits and parking areas; and
c) maintain streets i.e. road rights-of–way (RROWs), walkways, and
ramps.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Building Equipment Maintenance. The Architect shall:

A

a) assist the proper third parties in seeing to it that all equipment (air-
conditioning, sprinkler system, generators, transformers, telecommunications equipment, etc.) are properly maintained and in
good working condition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Business Development and Management. The Architect shall:

A

a) innovate schemes to attain maximum building occupancy
b) bill the tenants for rentals and utilities (electricity, water, telephone, cable, gas and other/ related dues)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

POST CONSTRUCTION EVALUATION
Upon the request of the Owner, the Architect shall:

A

a) evaluate the initial design program vs. the actual use of the facility;
b) determine the effectiveness of the various building systems and the materials systems in use;

c) assist the proper third parties in evaluating the functional effectiveness of the design and construction process undertaken, and

d) study, research, and give solutions to any discovered/ emerging/ evolving defects and failures such as shrinkage, water seepage and
other problems in the building. This is referred to as “forensic
investigation” of the building’s systems (Reference Doc 203).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

The Architect may enter into contract with the Owner in two possible ways:

A

a) Working in a dual capacity as Architect-of-record and as Consulting Architect for post construction services.

b) Working as Consulting Architect for post-construction services only.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

“COMPREHENSIVE ARCHITECTURAL SERVICES”

A

SPP DOCUMENTS 206

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

refers to the range of professional
services that covers Pre-design Services, Regular Design Services, Specialized Architectural Services, Construction Services and Post-Construction Services.

A

Comprehensive Architectural Services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

The Architect is _ to perform all the services. Rather, he is to act as the agent of the Client in procuring and coordinating the necessary
services required by a project

A

Not expected

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

involves management activities over and above the normal architectural and engineering (A&E) services carried out during the pre-design, design and construction phase. The over-all objective is to have control over time, cost and quality relative to the construction of a project.

A

Project Management (PM)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

The presence of a Project Manager does not relieve the designers and contractors of their respective normal duties and responsibilities in the _ of the project. The PM complements the functions of the Architects, Engineers and Contractors in meeting the broad and complex requirements of projects.

A

design and construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

As early as during the design development phase, perhaps even concurrently with the Architect’s commission, the Project Manager (PM) should conduct regular consultations with the Owner and with the Architects and Engineers (for A&E services) on all aspects of planning for the project.

A

Pre-Construction Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

If the Project Manager (PM) also serves as the Construction Manager (CM) to oversee time, cost and quality control during the construction of the project, he shall provide the services detailed under
SPP Documents 204-A and/or 204-B.

A

Construction Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

Normally, the Architect enters into a contract with the Owner to perform Comprehensive
Architectural Services. By the very nature of the services, he assumes the _ of the
Project Manager (PM) and the Construction Manager (CM), or effectively the overall
coordinator whose functions are outlined under this SPP.

A

dual role

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

To perform the variety of services indicated under the Comprehensive Architectural Services, the Architect must make full use of his own capability as well as of services offered by other professionals. He may expand his staff by hiring the experts needed, or he may form a team consisting of professionals such as but not limited to:

A

1) Architects
2) Engineers
3) Market Analysts
4) Accountants
5) General Contractors
6) Real Estate Consultants
7) Sociologists
8) Planners
9) Bankers
10) Lawyers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

It may be the responsibility of the PM to either hire the Construction Manager (CM) to be paid either by him or directly by the Owner on salary, or on the basis of percentage of construction cost or to serve as the CM himself. In like manner, the Fulltime Supervisor can either be a staff member of the PM or hired
directly by the Owner.

A

If a Project Manager (PM) is hired by the Owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

The Project Manager (PM, whether individual or firm) operates as a member of an Owner-Architect-Engineer-Contractor Team.
>prime responsibility for the
plan/design of the project.

A

Architect and the Specialist Consultants (SCs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

The Project Manager (PM, whether individual or firm) operates as a member of an Owner-Architect-Engineer-Contractor Team.
> responsible for their respective engineering plans.

A

Engineers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

The Project Manager (PM, whether individual or firm) operates as a member of an Owner-Architect-Engineer-Contractor Team.
> responsible for his men and equipment and the delivery of the project.

A

Contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

The Project Manager (PM, whether individual or firm) operates as a member of an Owner-Architect-Engineer-Contractor Team.
> Makes decisions on the project and assures that funds are available to complete the project.

A

OWNER

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

The Project Manager (PM, whether individual or firm) operates as a member of an Owner-Architect-Engineer-Contractor Team.
> Primary responsibility is the exercise of overall cost control. He will plan, program and monitor the various activities, and will act as an adviser on material costs and construction methods.

A

Project Manager (PM)’s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

Involves the definition of the requirements of the project by the Owner.
Gathers relevant information and data
Prepares an initial statement of probable construction cost.

A

PROJECT DEFINITION PHASE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
42
Q

Consists of the preparation of schematic design studies derived from the Project Definition Phase, leading to conceptual plans.
Prepares the initial line drawing
Submits to the Owner of SPPCC

A

SCHEMATIC DESIGN PHASE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
43
Q

Approved schematics and conceptual plans
Outline specifications to fix and illustrate the size and character

A

DESIGN DEVELOPMENT PHASE

44
Q

Approved Design Development Documents
Prepares the complete Contract Documents.
Submits to the Owner seven (7) sets of all construction drawings

A

CONTRACT DOCUMENT PHASE

45
Q

Prepares the Bid Documents
Assists the Owner from the early stage

A

CONTRACT DOCUMENT PHASE

46
Q

Makes decisions on all claims of the Owner and Contractors
Prepares change orders, gathers and turns over to the Owner

A

CONSTRUCTION PHASE

47
Q

Simplest utilization
WITHOUT partitions
lists:
Armories
Bakeries
Freight Facilities
Habitable Agricultural Buildings
Hangars
Industrial Buildings
Manufacturing / Industrial Plants
Other similar utilization type buildings
Packaging and Processing Plants
Parking Structures
Printing Plants
Public Markets
Service Garages
Simple Loft-Type Buildings
Warehouses

A

GROUP 1

48
Q

Moderate complexity of plan / design
Art Galleries
Banks, Exchange and other Buildings
Financial Institutions
Bowlodromes
Call Centers
Churches and Religious Facilities
City/Town Halls & Civic Centers
College Buildings
Convents, Monasteries & Seminaries
Correctional & Detention Facilities
Court Houses/Halls of Justice
Dormitories
Exhibition Halls & Display Structures
Fire Stations
Laundries & Cleaning Facilities
Libraries
Malls / Mall Complexes
Motels & Apartels
Multi-storey Apartments
Nursing Homes
Office Buildings / Office Condominium
Park, Playground and Open-Air
Recreational Facilities
Residential Condominiums
Police Stations
Postal Facilities
Private Clubs
Publishing Plants
Race Tracks
Restaurants / Fastfood Stores
Retail / Wholesale Stores
Schools
Serviced Apartments
Shopping Centers
Showrooms / Service Centers
Specialty Shops
Supermarkets / Hyper-marts
Welfare Buildings
Mixed Use Buildings
Other buildings of similar nature or use

A

GROUP 2

49
Q

Exceptional character and complexity of plan / design
Science involve
lists:
Airports / Wet & Dry Ports & Terminals
Aquariums
Auditoriums
Breweries
Cold Storage Facilities
Convention Facilities
Gymnasiums
Hospitals & Medical Buildings
Hotels
Laboratories/ Testing Facilities
Marinas and Resort Complexes
Medical Arts Offices & Clinics
Mental Institutions
Mortuaries
Nuclear Facilities
Observatories
Public Health Centers
Research Facilities
Stadia
Telecommunication Buildings
Theaters & Similar Facilities
Transportation Facilities & Systems
Veterinary Hospitals
Other buildings of similar nature or use

A

GROUP 3

50
Q

Residences

A

GROUP 4

51
Q

Monumental Buildings
Exposition & Fair Buildings
Mausoleums, Memorials, & Monuments
Museums
Specialized decorative buildings Buildings of similar nature or use

A

GROUP 5

52
Q

Re-used for the repetitive construction

A

GROUP 6

53
Q

Construction of several residential units on a single site

A

GROUP 7

54
Q

Projects involving extensive detail such as designs for built-in components or elements

A

GROUP 8

55
Q

Alterations, renovations, rehabilitations, retrofit and expansion / additions to existing buildings belonging to Groups 1 to 5

A

GROUP 9

56
Q

Engaged to render opinion or give advice, clarifications or explanation

A

GROUP 10

57
Q

PRE-SERVICE DESIGN

A

SPP DOCUMENTS 201

58
Q

as used for this SPP and the succeeding SPP documents shall refer only to the Professional Regulation Commission (PRC), duly created under R.A. No. 8981 (The PRC Modernization Act of 2000).

A

Commission

59
Q

is a required document under Sec. 41 of R.A. No.9266 (The Architecture Act of 2004) and its Implementing Rules and Regulations (IRR).

A
  • Standards of Professional Practice (SPP)
60
Q

used for this SPP and the succeeding SPP documents shall refer only to the Professional Regulatory Board of Architecture (PRBoA), duly created under R.A. No. 9266 and its IRR and under the supervision and administrative control of the Commission.

A

BOARD

61
Q

used for this SPP and the succeeding SPP documents shall refer only to a Registered uand Licensed Architect (RLA), a natural person under Philippine law and jurisprudence with a valid certificate of registration and a valid professional identification card (representing the renewable 3-year license)

A

ARCHITECT

62
Q

used for this SPP and the succeeding SPP documents shall refer only to a juridical person under Philippine law and jurisprudence, duly registered with the Department of Trade and Industry (DTI) as a sole proprietorship for individual architectural practice or registered with the Securities and Exchange Commission (SEC) and with the Professional Regulation Commission (the PRC or hereafter the Commission) as a professional partnership or as an architectural corporation for group architectural practice by RLAs, subject to full compliances with Sec. 37 of R.A. No. 9266 and derivative regulations

A

ARCHITECTURAL FIRM

63
Q

as used for this SPP and the succeeding SPP documents shall refer only to Registered and Licensed Professionals (RLPs), all natural persons under Philippine law and jurisprudence with a valid certificate and a valid professional identification card (representing the renewable license) for the lawful practice of a State-regulated profession other than Architecture.

A
  • Professional/s
64
Q

may be used interchangeably for this SPP and some of the succeeding SPP.

A

Client, Owner and Project Proponent

65
Q

shall also mean Constructor or Builder, and may be used interchangeably for this SPP.

A

Contractor and General Contractor

66
Q

ADR

A

Alternative Dispute Resolution

67
Q

AF

A
  • Architectural Firm
68
Q

ADC

A

Architectural Design Competition

69
Q
  • Aicc
A
  • Architect in charge of construction
70
Q
  • BPO
A
  • Business Process Outsourcing
71
Q
  • CA
A
  • Consulting Architect
72
Q
  • CEC
A
  • Codes of Ethical Conduct
73
Q

This selection is used when undertaking a relatively small project.

A

Direct Selection

74
Q

This selection may be conducted by committees representing institutions, corporations or public agencies.

A

Comparative Selection

75
Q

The comparative selection process involves:

A

⚬ Invitation

76
Q

Includes the Terms of Reference (ToR) for the project which is based on the Design Brief prepared by another Architect. The selection committee established by the Client may consist of representatives from other State-regulated professions and/or the construction industry, as well as persons with related expertise.

A

⚬ Invitation

77
Q

This Selection may be conducted by committees representing institutions, corporations or public agencies.

A

Comparative Selection

78
Q

The comparative selection process involves:

A

⚬ Pre-qualification
⚬ Interview
⚬ Verification

79
Q

Architects and/or PRC-registered Architectural Firms (AFs) submit information regarding their qualification and expertise.

A

Pre-qualification

80
Q

The Architect explains his methodology in translating the plan/design requirements of the proposed project.

A

Interview

81
Q

The selection committee may visit buildings designed by the Architects and check references such as former clients and financial institutions.

A

Verification

82
Q

Is used for civic or monumental projects. The competition may either be an idea competition, design or design build competition.

A

Architectural Design Competition (ADC)

83
Q

Participants Architectural Design Competition

A
  • Sponsor or Client
  • Competitors
  • Professional Adviser
  • Jury
84
Q

a natural or juridical person

A

Sponsor or Client

85
Q

Filipino/ Philippine-Registered and Licensed Architects (RLA) and IAPOA members in good standing.

A

Competitors

86
Q

Philippine-Registered and Licensed Architects (RLAs) who are IAPOA members in good standing

A

Professional Adviser

87
Q

Composed of at least five (5) members who are known for their integrity, objectivity, impartiality and honesty.

A

Jury

88
Q

SPP DOCUMENTS 201

A

PRE-SERVICE DESIGN

89
Q

cover a broad line of architectural services ranging from initial problem identification to activities that would allow the Architect to initially conceptualize an array of architectural and allied solutions.

A

Pre- Design Services

90
Q

When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project.

A

CONSULTATION

91
Q

These preliminary studies involve the procurement, analysis and use of secondary information gathered for the project to aid the Client in early decision-making. They represent the Architect’s initial assessment of a project’s soundness, allowing the Client to promptly explore available/ readily identifiable directions / options.

A

PRE-FEASIBILITY STUDIES

92
Q

Detailed analysis of the project based on pre-
feasibility studies will determine the viability of a proposed development. The studies will set the project against present and future trends to forecast how it will perform over time. This requires primary data gathering and analysis.

A

FEASIBILITY STUDIES

93
Q

This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program.

A

SITE SELECTION AND ANALYSIS

94
Q

The detailed analysis of the site involves the identification of a site’s development potentials through the proper utilization of land. The analysis covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs

A

SITE UTILIZATION AND LAND-USE STUDIES

95
Q

entails the conduct of primary and secondary researches and assembled facts used as basis for conclusion.

A

ARCHITECTURAL RESEARCH

96
Q

This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution. It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.

A

ARCHITECTURAL PROGRAMMING

97
Q

The Architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use, allocation and interface of spaces for given activities.

A

SPACE PLANNING

98
Q

An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces

A

SPACE MANAGEMENT STUDIES

99
Q

This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost- reduction programs. The goal of value management is to achieve an unimpaired program at minimum cost.

A

VALUE MANAGEMENT

100
Q

Under design brief preparation, the Architect states the project terms of reference (TOR) including the concept, objectives and other necessary requirements to bid out architectural services (whether public or private).

A

DESIGN BRIEF PREPARATION

101
Q
  • Projects may require promotional activities in order to develop and generate financial support and acceptance from governing agencies or from the general public. In such cases, the Architect can act as the agent of the Owner by producing and coordinating the additional activities necessary to complete the services.
A

PROMOTIONAL SERVICES

102
Q

MANNER OF PROVIDING SERVICES

A
  • PROMOTIONAL SERVICES
  • MANNER OF PAYMENT
  • OWNER’S RESPONSIBILITIES
103
Q

This method of compensation is frequently used where there is continuing relationship involving a series of projects. It establishes a fixed sum over and above the reimbursement for the Architect’s technical time and overhead. An agreement on the general scope of the work is necessary in order to set an equitable fee.

A

PROFESSIONAL FEE PLUS EXPENSES

104
Q

This method may be applied to government projects since they entail more paper work and time-consuming efforts

A

LUMP SUM OR FIXED FEE

105
Q

SCOPE OF PRE-DESIGN SERVICES

A

SCHEMATIC DESIGN PHASE
DESIGN DEVELOPMENT PHASE
CONTRACT DOCUMENT PHASE
CONTRACT DOCUMENT PHASE
CONSTRUCTION PHASE

106
Q

SPP DOCUMENTS 203

A

SPECIALIZED ARCHITECTURAL SERVICES

107
Q

Responsibilities of Construction Manager

A

> coordination and supervision
cost and time control
quality control of work
keeping of records