SLIDES Flashcards
Line placement in a BROWNSTONE TYPE ROWFRAME
1st Floor Fire
1st line stretched through front door on 1st floor to extinguish fire
2nd line if not needed to back up 1st line shall be stretched through front door on 2nd floor (parlor) to maintain integrity of the interior stairs
BROWNSTONE TYPE ROWFRAME - Building fully involved and fire in exposures - HOLDING OPERATION
1st Engine drops 2 lines 1 3/4 and 3 1/2
1st line to fire building
2nd line back up 1st, if not needed stretched to top floor of most severe exposure
3rd line if 2nd backs up 1st, then to top floor of most severe exposure, if 2nd is there go to other exposure.
In both cases 2nd and 3rd line must be sure intermediate floors are checked while proceeding to top floor.
Line placement in a VACANT row frame in a row of occupied frames.
1st engine drops 2 lines, 3 1/2 and 1 3/4.
1st line most severe exposure
2nd line if not needed to back up 1st, stretched into fire building or other exposure.
3rd goes where ever the 2nd did not go.
Occupied exposures should be given first consideration and all operations should be in the direction.
Line placement in VACANT buildings in a ROW.
1st engine drops 2 lines, 3 1/2 and 1 3/4
1st line operates from exterior until LCS is placed in operation, then 1st line goes to most severe exposure.
2nd line if not needed to back up 1st, stretched to opposite exposure or through an exposure to the rear yard.
Priority order of shutting down Natural Gas
1- Appliance valve 2-Interior Gas Riser Valve 3-Meter Valve/Master Meter 4-Head of Service Valve 5-Exterior Gas Valve 6-Curb Valve 7-Street Valve - FDNY does NOT shut this valve down
Hi Rise Office Fire Positions
1st - 4th Engines
1st - 4th Ladders
1st and 2nd engine - fire floor 1st line 3rd and 4th engine - fire floor 2nd line 1st and 2nd truck - fire floor 3rd truck - floor above 4th truck - top 5 floors
Manually operated fire pumps….
K- Knife Switch C- Circuit Breaker Start- Start Button Lever- Lever to desired speed "K.C. Start the Lever"
Strategic Operating Plan for High Rise Fire:
"D-VEG-C" D - Determine Floor V- Verify fire floor E - Evacuation (simultaneously or ASAP) G - Gain control of building systems C- Confine and extinguish fire