SFSCs Flashcards
LOCA (Inventory Control)
Cond 1:
a. LPZR > 10% [15%]
b. RCS ≥ 24°F [44°F] SC
c. RVUH ind ≥ 16%
-OR- Cond 2: a. SI flow adq, Appx2 b. CET SC < 44°F[60°F] sh and NOT ↑ c. RCS SC < 44°F[60°F] sh and NOT ↑
LOCA (RCS Pressure)
Cond 1:
a. PPZR w/in Appx2
-OR-
Cond 2:
a. SI flow adq, Appx2
LOCA (Core Heat Removal)
a. CET SC <44°F[60°F] sh and NOT ↑
b. RCS SC <44°F[60°F] sh and NOT ↑
LOCA (CNMT ISOLATION)
Cond 1:
a. PCONT < 3 psig
b. No valid ɣ, CONT
c. No valid ɣ, Steam Plant
-OR-
Cond 2:
a. No valid ɣ, Steam Plant
b. CIAS actuated
LOCA (CNMT Temp and Pressure Control)
Cond 1:
a. TCONT < 235°F
b. PCONT < 8.5#
c. H2 <1.1%
-OR- Cond 2: a. ≥1 CS Hdr flow > 4350 gpm b. PCONT < 55# c. H2 <4.9%
SGTR (Inventory Control)
Cond 1:
a. LPZR > 10%
b. RCS ≥ 24°F SC
c. RVUH ind ≥ 16%
-OR-
Cond 2:
a. SI flow adq, Appx2
b. RVLMS outlet plenum ≥ 21%
SGTR (RCS Pressure)
Cond 1:
a. PPZR w/in Appx2
-OR-
Cond 2:
a. SI flow adq, Appx2
SGTR (Core Heat Removal)
a. TH < 650°F
b. CET Max quad temp < 650°F
SGTR (RCS Heat Removal)
Cond 1: a. Unisol LS/G 45-60% -or- FW restoring LS/G to 45-60% NR b. TC ↔ or ↓
-OR-
Cond 2:
a. SDC in-service
SGTR (CNMT Isolation)
a. PCONT < 2.5 psig
b. No valid ɣ, CONT
c. No abnorm ↑ in CONT sump levels
d. Iso PS/G < 1135 psia and ↔ or ↓
SGTR (CNMT Temp and Press Control)
a. TCONT < 117°F
-or-
TCONT <125°F w/LOOP
b. PCONT < 2.5 psig
ESD (Inventory Control)
Cond 1:
a. LPZR > 10% [15%]
b. RCS ≥ 24°F [44°F] SC
c. RVUH ind ≥ 16%
d. SI flow NOT needed to maintain LPZR after SI Throttle Criteria met
-OR-
Cond 2:
a. SI flow adq, Appx 2
b. RVLMS outlet plenum ≥ 21%
ESD (RCS Pressure)
Cond 1:
a. PPZR w/in Appx2
-OR-
Cond 2:
a. SI flow adq, Appx2
ESD (Core Heat Removal)
a. TH < 650°F[650°F]
b. CET Max quad temp < 650°F
c. RCS ≥ 24°F [44°F] SC
ESD (CNMT Isolation)
a. PCONT < 3 psig
-or-
CIAS actuated
b. No valid ɣ, CONT
c. No valid ɣ, Steam Plant
-or-
If Rad Mon & S/G samples NOT avail, rad surveys of S/G release points show no unexplained ↑ in Steam Plant ɣ