Set Up And Operations 150104g Flashcards
Loading tools through the spindle is very useful for setting what compensation values?
Tool length compensation
Loading tools through the spindle requires you activate the automatic tool changer in what mode?
Manual data input, MDI
What is the normal tool change position for a vertical Machining Center?
Z axis zero return
Name four things that are required before an automatic tool changer can change tools.
Load assembled tools into magazine
Position machine axes to the tool change position, Z zero return
Provide a command to make tool change, T word and M06
Provide command that rotates the magazine to bring next toolstation to ready position, T word
Why is the double arm automatic tool changer the most efficient?
It gets the next tool station to the ready position while Machining occurs
What tool changer styles do not use a change arm?
Rotary and table mounted
When is tool length compensation in stated?
During each tools first Z-axis approach to the workpiece
What codes are used to initiate tool length compensation?
G43 and an H word
Describe two popular ways to use tool length compensation?
The tool length is placed in the tool length compensation offset register
The distance from the cutting tool tip to The z axis program zero point is placed in the tool length compensation offset register
Name three reasons why method #1 is recommended when setting tool length compensation
You can measure tool length compensation values offline using a tool length measuring device
You don’t have to re-measure cutting tools
Share cutting tools among Machining centres
When using an offline tool length measuring machine will the value be positive or negative?
Negative
If you make the tool length compensation value the length of the cutting tool, what value must you place in the Z axis register of the fixture offset (G54)?
The distance from the spindle nose or (gauge line AIT), to program zero point
If you make the tool length compensation value the distance from the tool tip to program zero, what value must you place in the Z axis register of the program zero assignment value?
Zero
List three different names for part zero
Program zero point, work zero, workpiece origin
What is part zero purpose in X and Y?
It involves determining the distance in each axis from the zero return position to the program zero point