Section 3 Flashcards

Terms and Definitions

1
Q

What is an ‘Alteration’?

A

Physical change with design implications

API 653 par 3.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is an Authorized TANK inspector?

A

Employee of an Authorized Inspection Agency qualified and certified

API 653 par 3.4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is breakover point?

A

Area on a tank bottom where settlement beings

API 653 par 3.5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is candiate tank?

A

Tank for which corrosion rates are not known

API 653 par 3.6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the critical zone?

A

Portion of the tank bottom or annular plate within 3” of the inside edge of the shell, measured radially inward

API 653 par 3.10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is door sheet?

A

Section of plate (or plates) cut from existing tank shell to create a temporary access opening

API 653 par 3.13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Dimension of a shell penetration that is considered to be a major repair or alteration?

A

> º12” NPS

API 653 par 3.20 (a)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Installing a bottom penetration within what distance of the shell is considered a major repair or alteration?

A

within 12” of the shell

API 653 3.25 (b)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Removing and replacing, or adding a shell plate beneath the design liquid level where the longest dimension exceeds what dimension is considered a major repair or alteration?

A

> º12”

API 653 par 3.20 (c)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Removing and replacing or adding a section of annualr plate ring where the longest dimension exceeds what dimension is considered a major repair or alteration?

A

> º12”

API 653 par 3.20 (d)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Removal and replacement of annular plate ring weld or vertical shell weld where the longest dimension exceeds what dimension is considered a major repair or alteration?

A

> º12”

API 653 par 3.20 (e)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What length of a bottom-to-shell would be a major repair/alteration if greater than 50% of the cross-section of the weld is repaired?

A

> º0”

API 653 par 3.20 (g)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is a repair?

A

Work necessary to restore a tank to a condition for safe operation

API 653 par 3.32

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is a repair organization?

A

An organization that meets any of the following:

a) an owner/operator of aboveground storage tanks who repairs or alters his/her own equipment in accordance with
this standard;
b) a contractor whose qualifications are acceptable to the owner/operator of aboveground storage tanks and who
makes repairs or alterations in accordance with this standard;
c) one who is authorized by, acceptable to, or otherwise not prohibited by the jurisdiction, and who makes repairs in
accordance with this standard.

API 653 par 3.33

How well did you know this?
1
Not at all
2
3
4
5
Perfectly