SCBA Fast Pak ADD 1 Flashcards

1
Q

What type of handle does a
LOW pressure side have?
What color is it?
Picture

A

Ball handle cover
The actual handle is black and the cover is orange with black writing with a yellow reflective strip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What type of handle does the
high-pressure side have?
What color is the cover?

A

T handle cover
Black with yellow reflective stripe

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Fast pak, the low pressure side of the bag that has the ball handle. Contains a non-CBR regulator and AV 2000 face piece and a nose cup. How long is the low pressure hose?

A

6ft
PS has dual manifold (Hansen Fittings)
2.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Fast Pak, the high-pressure side of the bag has a T handle cover and contains 4500 psi Scott air cylinder. How many minutes of use will you get with the cylinder? Right angle valve and how long is a high-pressure hose with universal coupling? 2.3

A

15 minutes
5 ft long hose
Remember Low Pressure hose is 6ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

T/F Fast pak,is there a remote pressure gauge with a high air whistle assembly?
2.5

A

False
Low Air Whistle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

T/F Fast Pak, both the high-pressure and low pressure systems can be operated simultaneously 3.4

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the fast pak not equipped with?
What are the two things it is equipped with?
4.1

A

Vibra- alert and HUD.
Remote gauge and low air whistle which indicates when the cylinder has 1/4 of his full capacity remaining

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Fast pak, it is essential that one member of the fast unit who has ——— ————with the extrication team, is assigned to monitor the actual volume of air remaining in the portable cylinder.

A

Audible Communication
4.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

T/F when a fast pak is in use the fast unit safety team shall acquire an additional fast pak from another unit on scene

A

True
4.5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Fast pak listen for the ———activation when the bottle is turned on when bleeding out the system?

A

Low air whistle
5.10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Fast Pak low pressure hose is —-ft in length. Attached the hose is a —- —- EZ flow regulator without a ——-and it’s got a Scott AV 2000 facepiece with a nosecup. 8.1

A

6ft
Non-CBRN
Vibra-Alert

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

T/F
Fast pak, during high-pressure operations one member of the Fast team must monitor the air supply and ensure the facepiece is providing air to the down member.

A

False
Low pressure operations
8.3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Fast pak, three ways to monitor the volume of air remaining in the cylinder. What are they?
8.3.1

A

Check remote Gauge
Listen for Low Air Whistle
(activates at 1/4 remaining)
Check cylinder gauge.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Fast pak, low pressure hoseline may be used in one of the following three ways. What are they?
8.5.1

A

Swap out REGULATORS
Disconnect members HANSEN connection and connect to fast pak Hansen fitting.
Replace members FACEPIECE.
Regulators-Hansen-Facepiece

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Fast Pak, if the member is unable to activate the inhalation valve, turn the red purge valve ——-, away from the members face to achieve a sufficient flow, and ensure the purge valve remains ——-.

A

Downward
Open
8.6.3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Fast Pak, disconnect the Hansen fitting on the members low pressure hose ——- their regulator. ——— the male coupling in FIRST then pull back the sleeve to disengage a coupling.

A

Below
Push
8.7.1

17
Q

T/F Fast pak, if the cylinder and or valve assembly of the distressed member show damage or evidence of exposure to medium or high heat or flame. A decision must be made whether that UAC is suitable for recharging.

A

The word medium heat is not mentioned 9.2

18
Q

Fast Pak the —— foot high-pressure hose will administer air to a members SCBA via the UAC this will equalize both air cylinders in approximately —— seconds. 9.4.1

A

5ft
60 seconds

19
Q

Fast Pak, when removing member from IDLH, the ——pressure UAC coupling must be removed. Severing the ———pressure hose during removal will deplete all the air from the system. The remaining air in the fast pack can also be used to equalize the members SCBA again if needed or another member in need of air. 9.7.6

20
Q

Fast Pak if the UAC on the members SCBA is damaged, do not attempt to connect the high pressure UAC airline assembly from the fast pak use one of the other high-pressure methods. 10.5

A

False
Use one of the low-pressure methods

21
Q

Fast Pak, if the ——- on the UAC of the members SCBA is missing quickly examine and remove any visible debris before connecting into the UAC. If the UAC is impacted and or blocked with debris, use one of the low pressure methods. 10.6

22
Q

T/F Fast pak, if at anytime during the filling process, a leak is detected immediately discontinue the filling, procedure and supply air via one of the low pressure methods 10.7

23
Q

T/F Fast Pak, can be augmented with air in three of the following ways
1-utilizing another fast pak
2-utilizing an additional mask
3-SOC units use an air cart 200 foot hose

A

True
Read this section too much info to put on card. Section 11 page10

24
Q

Can the Fast Pak assigned to the fast Unit be used on non-FDNY members
12.2

A

No
Not the Fast Pak assigned to the Fast Unit

25
Q

The designated Fast unit shall always bring their ——— to the incident command post
13.1

26
Q

T/F When use of the Fast Pak is anticipated it is recommended the member assigned to monitor the air turn on the cylinder when arriving at the location of the member in distress. 13.4

A

True
(This is new) ***
Turn on cylinder when arriving at distressed member.

27
Q

Fast Pak
NEW Material
What is the fastest method?
What is the slowest method?
13.7

A

This is the actual order!
Replace the regulator fastest.
Replace Hansen
Replace Facepiece
Utilize the high pressure equalization method is the slowest.