SCBA charging Procedures- U208 Flashcards
1
Q
Filling without the compressor running
7 steps
A
- Hook all cylinders to fill ports
- Close bleeder valve.
- Open cylinder valves
- Rotate cylinders into charge container.
- Raise fill and lock valve.
- Open bank #1 valve.
- If bank #1 will not fill cylinders to 4500 PSI, close bank #1 and open bank #2.
2
Q
Filling with the compressor running
A
- Hook all cylinders to fill ports
- Close bleeder valve.
- Open cylinder valves
- Rotate cylinders into charge container.
- Raise fill and lock valve.
- Open low bank/s.
- With generator running, push the left white button four times on the LE5000 controller to start the compressor.
- With the storage control valve closed, the compressor will fill the cylinders to 4700 before it fills the storage.
3
Q
To shut down the compressor
A
- If the storage is full, the compressor will shut down automatically.
- If storage is not full
a. shut down all bank valves
b. compressor will go through purge mode and then shut down.
The compressor will not restart automatically