Safe work at heights Flashcards

1
Q

Dynamic risk assessment. be aware of…

A

powerlines/overhead wires
air conditioning units
solar panels
skylights
slippery surfaces
steep pitches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Archer check…

A

A- anchors
R- rigging and reeving
c- connections
H- helmet harness hardware
E- Edges
R- ready on rope

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

what are the lines called

A

Transverse
Tag line(s)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Personal safety lines.
When?

A

trench collapse
care over an embankment
worker in a pit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Refurbishment of equipment 2 types…

A
  1. height safety equipment. petzl ID, rockers, purple slings Delta maillon, karabiners, harness
  2. Ancillary equipment- all other equipment in the kit
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

if SW@H safety equipment missing/damaged/out of date

A

1-keep kit together
2-contact FS10 for a loan kit to be sent
3- email roperescue@frv with kit details- kit no. person sending, kit item, serial number of item
4 swap kits and send to FS10
5- reswap when replacement arrives from FS10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Ancillary items

A

requisition necessary item through thornbury stores, div b ERM
must quote material number of item.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

LRL, if damaged, out of date or missing

A

-remove from LRL bag.
complete and scan a rope log card
email card to roperescue@frv
contact FS10 to organise loan or replacement
swap with replacement on appliance and send to 10
reinstate when returned from FS10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly