Rural Water Flashcards
1
Q
Tanker Task Force
A
1 Engine
3 Tankers
1 Command Officer
2
Q
Rural water 1st engine
A
Request tanker task force Location of dump site Lay out instructions from dump site to incident Location of fill site 1st truck positioning
3
Q
Short lay
A
Tanker at dump site (end of driveway)
If 2nd Engine before tanker, supply first engine
4
Q
Rural water 3rd Engine short
A
Dump site set up Stay with tanker, assist ops Water Supply Group Supervisor - in charge of dump and fill until 2nd BC Then becomes dump site unot leader
5
Q
Long lay 1st engine and 2nd
A
1st Engine and Tanker at site
2nd engine lays from dump site to 1st tanker
Dump site may be at drive way if enough space
6
Q
Long lay 1st tanker
A
Stops at dump site leave 4” siamese
Proceeds to incident without laying out
7
Q
Long lay 2nd Engine
A
Lays out from dump site
8
Q
Rural water long lay 3rd engine
A
No tanker? Supply siamese to 2nd engine
9
Q
Rural water 5th engine
A
Fill site unit