Risk Mgt System and Safety MP 201.01C Flashcards
1
Q
In the Risk Mgt System, what do “actions in a calculated manner” require?
A
- IC established
- proper PPE
- accountability system
- safety procedures in place
- continuous risk assessment by all
2
Q
When determining whether an incident will either be a Rescue or a Recovery, what things will be considered in making that determination?
A
- notification time
- dispatch time
- response time
- on scene time