Risk and Technical Management Flashcards

1
Q

What is risk

A

measure of probability that a program will miss cost, schedule and technical constraints.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is risk management

A

dealing with uncertainty, known unknowns, unknown unknowns.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

5 phases of risk management process

A
  1. risk management planning
  2. risk identification
  3. risk analysis
  4. risk response planning
  5. risk monitoring and control
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

phase that creates the risk management plan

A

risk management planning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

risk management planning

A

analysis of the level, type, visibility of risk management needed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

risk identification

A

what can go wrong?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

risk analysis

A

ID possible consequences

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

components of risk

A

likelihood of occurrence, consequence

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

briefed at milestone review

A

risk rating matrix

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

risk response planning options

A
  1. assume risk, charlie mike
  2. eliminate root cause, or consequence
  3. mitigate the cause or consequence
  4. transfer the risk
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

risk monitoring and control

A

How can the planned risk response be implemented?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

3 categories of program data

A
  1. management data
  2. system support data
  3. ops and support data
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

4 elements of a TDP

A
  1. engineering drawings
  2. software documentation
  3. specifications
  4. material composition
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

contractually requires the contractor to deliver data

A

CDRL contract data requirements list

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

3 goals of config management

A
  1. ID and document functional and physical characteristics.
  2. control changes to config items
  3. record and report info regarding changes
  4. audit config items to verify conformance
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

aggregation of hardware, software or pubs that satisfies an end use function

A

configuration item (CI)

17
Q

gov’t role in interface management

A

ID external interfaces, establish interface baselines, maintain interface stability

18
Q

contractor role in interface management

A

manages internal interfaces, establish interface requirements

19
Q

Why config audits?

A

ensure CI and config documentation agree, are complete and accurate and satsify program requirements.

20
Q

What are tech reviews NOT for?

A

problem solving

21
Q

SRR phase and function

A

TD - allows entry into EMD

22
Q

PDR phase and function

A

preliminary design review either TD or EMD - allows to proceed into detailed design

23
Q

CDR phase and function

A

critical design review EMD - proceed to fabrication

24
Q

TRR phase and function

A

testing readiness review EMD - ensures the system is ready to proceed to formal test

25
Q

FCA phase and function

A

functional config audit EMD - proceed to LRIP

26
Q

PCA phase and function

A

physical config audit P&D - ensures item matches the contract

27
Q

why use TPM?

A

technical performance measurement - the smoke alarm for performance deficiencies or excesses.

28
Q

specifications

A

milspec, perfspec, detailspec

29
Q

3 config baselines

A

functional (system baseline)
allocated (design to) preliminary design
product (build to) detailed design