1
Q

Reactor Building Tech Spec with 1 hr actions

A

Reactor building operable
Modes 1-4

Condition: RB inop
Action: Restore to operable
Time: 1 hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Reactor building air lock Tech spec with 1 hr actions

A

2 reactor building air locks operable
Modes 1-4
Notes: entry and exit permitted to repair, separate condition entry for each air lock, enter applicable condition when leakage exceeds overall RB leakage rate

Condition: 1+ air locks inop
Action: verify operable door is closed (1 hr) AND Locked (24 hrs)

Condition: 1+ air lock interlock mech inop
Action: Verify operable door is closed (1 hr) AND lock (24 hr)

Condition: 1+ air locks inop for reasons other than A or B
Action: Initiate action to evaluate RB leakage (immed) AND verify door closed in affected air lock (1 hr)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

reactor building isolation valve tech spec and 1 hr actions

A

TS: each reactor building isolation shall be operable.
Modes 1-4
Notes: see spec

Condition: (only applicable to penetration paths with 2 RB iso valves) 1+ penetration flow paths with 2 RB iso valves inop
Action: isolate affected penetration flow path with at least 1 closed and deactivated auto valve, closed man valve, or blind flange

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

reactor building spray and cooling tech spec with 1 hr actions

A

TS: 2 trains of spray and 2 trains of cooling operable
Modes 1-4
1 spray and 1 cooling
Modes 3 & 4

Condition: 2 spray trains inop Modes 1 or 2 OR
Any combo of 3 trains inop Modes 1 or 2 OR
1 required spray & cooling train inop Modes 3 or 4
Action: LCO 3.0.3 (immediately)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

reactor building pressure tech spec with 1 hr actions

A

TS: reactor building pressure >= -1.0 psig and <= 3.0 psig
Modes 1-4

Condition: RB press not within limits
Action: restore within limits (1hr)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

spray additive system tech spec with 1 hr actions

A

TS: spray additive system operable
modes 1 and 2

NO 1 hr ACTIONS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

BWST tech specs with 1 hr actions

A
TS: BWST operable:
40F < T < 110F
2470 +/- 200 ppm
40.2 +/- 1.8 feet
Modes 1-4

Condition: Inop not due to boron or water temp.
Action: restore to operable (1 hr)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Design limits on reactor building

A

286F and 59 psig

design basis 5sqft rupture hot leg

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Sump recirc flow is throttled to _______ gpm for NPSH concerns?

BWST flow?

A

1050-1200

1700 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Definition of reactor building intact

A

all 3 hatches closed and sealed
all non-auto valves and blind flanges installed as required
all auto-isolation valves operable or deactivated in closed position
RB total leakage < amount allowed by RCS leakrate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Purpose of NaOH

A

iodine 131 absorption

raises pH, thereby reducing corrosion and H2 formation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Function of reactor building spray

A

Primary: reduce post accident temp and press inside building
secondary: remove iodine during LOCA
Both headers operable = 200% iodine and 100% cooling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Spray and cooling iodine-heat removal combos

A

Iodine: 1 train of spray (both trains is 200% removal)

100% Heat removal: 2 trains of spray, Both Cooling units, 1 spray & 1 cooling unit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

ES actuations for spray

A

ES 7/8 starts A/B spray pump after 35 second delay
DH vault coolers start on pump start
Spray blocks cv-2401/2400 open on ES 7/8
BWST ISOs 1407/1408 open on ES 1/3 and 2/4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Spray alarms and setpoints

A

spray hi flow >= 1700 gpm
ES failure = P-35 breaker open 55 seconds after ES 7/8 OR
spray flow <1050 gpm 55 seconds after ES 7/8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

reactor building spray flow band

A

1050-1200 gpm

17
Q

Don’t drain sump below ___ level for debris.

A

30.4%