Reactor Building Tech Spec with 1 hr actions
Reactor building operable
Modes 1-4
Condition: RB inop
Action: Restore to operable
Time: 1 hr
Reactor building air lock Tech spec with 1 hr actions
2 reactor building air locks operable
Modes 1-4
Notes: entry and exit permitted to repair, separate condition entry for each air lock, enter applicable condition when leakage exceeds overall RB leakage rate
Condition: 1+ air locks inop
Action: verify operable door is closed (1 hr) AND Locked (24 hrs)
Condition: 1+ air lock interlock mech inop
Action: Verify operable door is closed (1 hr) AND lock (24 hr)
Condition: 1+ air locks inop for reasons other than A or B
Action: Initiate action to evaluate RB leakage (immed) AND verify door closed in affected air lock (1 hr)
reactor building isolation valve tech spec and 1 hr actions
TS: each reactor building isolation shall be operable.
Modes 1-4
Notes: see spec
Condition: (only applicable to penetration paths with 2 RB iso valves) 1+ penetration flow paths with 2 RB iso valves inop
Action: isolate affected penetration flow path with at least 1 closed and deactivated auto valve, closed man valve, or blind flange
reactor building spray and cooling tech spec with 1 hr actions
TS: 2 trains of spray and 2 trains of cooling operable
Modes 1-4
1 spray and 1 cooling
Modes 3 & 4
Condition: 2 spray trains inop Modes 1 or 2 OR
Any combo of 3 trains inop Modes 1 or 2 OR
1 required spray & cooling train inop Modes 3 or 4
Action: LCO 3.0.3 (immediately)
reactor building pressure tech spec with 1 hr actions
TS: reactor building pressure >= -1.0 psig and <= 3.0 psig
Modes 1-4
Condition: RB press not within limits
Action: restore within limits (1hr)
spray additive system tech spec with 1 hr actions
TS: spray additive system operable
modes 1 and 2
NO 1 hr ACTIONS
BWST tech specs with 1 hr actions
TS: BWST operable: 40F < T < 110F 2470 +/- 200 ppm 40.2 +/- 1.8 feet Modes 1-4
Condition: Inop not due to boron or water temp.
Action: restore to operable (1 hr)
Design limits on reactor building
286F and 59 psig
design basis 5sqft rupture hot leg
Sump recirc flow is throttled to _______ gpm for NPSH concerns?
BWST flow?
1050-1200
1700 gpm
Definition of reactor building intact
all 3 hatches closed and sealed
all non-auto valves and blind flanges installed as required
all auto-isolation valves operable or deactivated in closed position
RB total leakage < amount allowed by RCS leakrate
Purpose of NaOH
iodine 131 absorption
raises pH, thereby reducing corrosion and H2 formation
Function of reactor building spray
Primary: reduce post accident temp and press inside building
secondary: remove iodine during LOCA
Both headers operable = 200% iodine and 100% cooling
Spray and cooling iodine-heat removal combos
Iodine: 1 train of spray (both trains is 200% removal)
100% Heat removal: 2 trains of spray, Both Cooling units, 1 spray & 1 cooling unit
ES actuations for spray
ES 7/8 starts A/B spray pump after 35 second delay
DH vault coolers start on pump start
Spray blocks cv-2401/2400 open on ES 7/8
BWST ISOs 1407/1408 open on ES 1/3 and 2/4
Spray alarms and setpoints
spray hi flow >= 1700 gpm
ES failure = P-35 breaker open 55 seconds after ES 7/8 OR
spray flow <1050 gpm 55 seconds after ES 7/8