Core Flood Flashcards

1
Q

List the acceptance criteria for ECCS.

A
Hydrogen <= 1%
Oxidation of cladding <=17%
Temperature of cladding <=2200F
Cool-able geometry
Keep cool (Long Term)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Why do we call Core Flood a passive system?

A

No outside power is required
No outside actuation signal is required
Nitrogen pressure provides the driving force

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is required for ONE train of ECCS?

A

ONE train of HPI
ONE train of LPI
BOTH CFTs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the 3 phases of a LOCA?

A
  1. ) Blowdown- rapid loss of coolant
  2. ) Refill- both CFT discharge
  3. ) Reflood- HPI & LPI injection
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the Function of CFT System?

A

Core Protection after intermediate to large breaks
Passive injection when RCS <600#
Both tanks cover 3/4 of core

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the required CFT boron concentration?

A

2270-3500 ppm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

List ECCS Acceptance Criteria

A
  • Peak clad temp. <= 2200 deg F
    • Clad oxidation <= 17% of clad thickness
    • Max H2 generation <= 1% of all that could be generated
    • Maintain coolable core geometry
    • Provide long-term cooling
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Core Flood Tank Tech Specs with 1 hr Conditions

A

Two CFTs operable
Modes 1 & 2, Mode 3 with RCS press >800psig

Condition: 1 CFT inop for reasons other than boron
Action: Restore to operable status
Completion Time: 1 hour

• Level: 12.6 to 13.4 feet
• Pressure: 560 to 640 psig
• MOV Discharge Valve de-energized open (TRM) One of Two pressure and One of Two level instrument channels per CFT
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Basis for pressure and level limits.

A
640# = sufficient volume to refill
560# = sufficient pressure to fully inject in time
  1. 4’ = enough N2 to fully inject contents
  2. 6’ = sufficient volume to refill
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Horn and lights if CFT MOV closed and RCS press >____psig

A

750psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In normal ops, MOVs opened when raising RCS press @ _______ psig.

A

700-730 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

In normal ops, CFT MOVs required to be open prior to ____ psig RCS press.

A

800 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

In normal ops, CFT MOVs required to be closed prior to ____ psig RCS press.

A

700 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Describe interlocks between CFT outlet valves and DH valves.

Which CFT to which DH valve?

A

A CFT interlocked with CV-1050 and B CFT interlocked with CV-1410

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Decay heat iso valve will _____ if CFT outlet valve is removed from 100% _____ seat.

A

Close, closed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly