Quality Concrete Flashcards

1
Q

For concrete to set quickly, Type ___ concrete should be used to produce high early strength

A

Type III

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the result of too much water in a concrete mix?

A

High slump, lower strength

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which is a characteristic of air-entrainment concrete?

A

increases workability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When can fly ash be used in the calculation of minimum cement content for a concrete mix?

A

When allowed by the specifier

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which type of foundation would generally be specified when the allowable bearable capacity of the soil is very low to great depths?

A

mat, raft or floating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The maximum delivery time for ready mix concrete is

A

1.5 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The safety factor for form tiles is

A

2:1 ratio

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What would reduce the lateral pressure on concrete forms?

A

slower placement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The main purpose for steel reinforcement is to resist what type of force?

A

Tensile forces

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

A #5 bar has what characteristics?

A

.625” diameter, .31 in2, 1.043 lbs/ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the effect of lowering the top bar or raising the lower bar by 1/2” more than specified in a 6” slab?

A

Reduce carrying load by 20%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the most effective types of water stops made of?

A

PVC polyvinylchloride

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Control joint cuts in a slab should be to a depth of ____ the slab thickness

A

1/4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Within how many hours after placement should concrete joints be sawn?

A

4 to 12 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which type of joint is used to control cracks where placement of concrete is interrupted?

A

Construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

In a mat slab, generally, where below the top is the steel located?

A

2” below the top

17
Q

Welded wire fabric is located where and for what reason?

A

upper part to prevent cracks

18
Q

To facilitate handling and workability, most specifications will allow the job-site addition of water to the concrete mix to an amount that ____

A

water to cement ratio is not exceeded

19
Q

To pump through a 5” line, a mix design should consist of a well-graded mix of ____

A

4” slump with air and fly ash

20
Q

If lightweight aggregate to be pumped is not presoaked so that it consistently contains 70-80% of total absorption, the aggregate may ____

A

become more difficult to pump

21
Q

A vibrator should not remain at one location in the concrete for more than _____ seconds

A

10-15 seconds

22
Q

Air entrainment increases the probability of which type of concrete field problems?

A

Blistering

23
Q

A non-slip surface on the concrete is obtained by what means?

A

Broom finish