Using a 1/4”: 1’ scale, 3 1/2” will represent
14’
Lines that terminate with arrows
Dimension line
Show building with boundaries
Plot or Site Plan
Designates brand and model number of window
Window schedule
Concrete is made of four parts
Water, sand, cement, aggregate
Affects the weight of concrete the most
Aggregate
Added to concrete to slow set up
Retarder
Added to concrete to control durability
Water
The wetter the concrete, the ____ the slump
greater
To remove air from concrete
Vibrate
The #5 rebar is ____ inch thick
1 = 1/8”
5/8”
#4 = 4/8”
#6 = 6/8”
Measures horizontal angles only
Builders level or dumpy level
Starting point for laying out a building
Benchmark
If layout for a rectangular building is square
Diagonals are equal
Install batter boards when
The grade and the corners have been established
Minimum placement of batter boards from the point of excavation
4’
If rod “A” reads 5’ and “B” reads 5’6”
A is 6” higher than B