What is rateable value?

A

An estimate of the annual rent a property could be let for if it were available to let on an open market at a fixed valuation date

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the EPC regulations?

A

The minimum energy efficiency standards

The energy efficiency (private rented property) regulations 2015 as amended

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is a modern letable standard?

A

Comply with the Homes (fitness for human habitation) Act 2018
Gas safety certificate
EPC
EICR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What did you do in relation to the landowner engagement exercise
Advice and regulations

A

I advised my client that they should make contact with stakeholders impacted by their assets to
- Promote positive relations with stakeholders
- Ensure affected stakeholders are aware of responsibilities

Pipeline safety regulations 1996 s.16 -
to ensure no damage, operator must take steps to inform persons of whereabouts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the process for gathering quotes from a third party contractor?

A

Agree scope of works with client. Understand their timescales and budget.

Look on the FG approved contractors list
for contractors within discipline/specialist area

Requested quotes and timescales based on scope

Present these to client and advise which may be most appropriate based on fulfillment of scope of works/objectives and any recommendations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the CDM Regs in full?
When do these apply?

A

Construction (design and management) Regulations 2015

Applies to all construction work, including domestic

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When must the HSE be notified of construction work?
What is the notification?

A

30 days or 20 workers
Over 500 person days

F10 notification of construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What level of public liability cover would you expect?

A

Around £5m (max level of claim)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the process for getting contractors approved on the system?

A

Checking insurances - Public Liability
Work compliant with CDM Regs
Standard RAMS acceptable
Any reviews if they have a website
Any relevant accreditations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the Gas Safe Legislation?

A

The Gas Safety (installation and use) Regulations 1998 (as amended)

GSIUR 1998

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the penalty for not having a Gas Safety Check ?

A

£6,000

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are a LL responsibilities in relation to Gas Safety?
What is the specific regulation?

A

Regulation 36 -
Annual safety checks (recorded and issued to T)
Ongoing maintenance

Provide T with copy of check within 28 days

Tenancy agreement should permit access for Gas Safety Checks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What does a Gas Saftey check involve?

A

Gas appliances working correctly
Harmful gases removed safely
Ventilation routes clear and adequate
Saftey devices working correctly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What were the works required at Ireland Barn?

A

Recommended works to the flues on the boiler
Disconnected gas fire that was no longer in use in front room

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What paperwork did you collate for the letting of Barnfields Bungalow?

A

EICR
EPC
How to Rent Guide
Fire Saftey
Gas safety check (where applicable)
Deposit Protection Scheme
Chimney sweep
Legionella tests

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the regulations for an EICR

A

Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What are the LL responsibilities in relation to an EICR?
When are these required?

A

Required every 5 years
All resi tenancies shorter than 7 years
Report includes date for next test

7 days - LL must supply Local Authority with copy of the test within

28 days - Carry out remedial works & written confirmation to T/LA. Also supply T with report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What is the penalty for not having an EICR?

A

£30,000 penalty

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What is an EICR

A

Ensures that wiring and electrics within the property are up to electrical standards

18th Edition of Wiring Regulations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What are the MEES requirements for Commercial Properties

A

EPC rating E or above

Should dispay EPC if - 500m2 +, visited by public

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What are the MEES requirements for Residential Properties?

A

All domestic private rented properties, E or above from 2020.

Likely to be above C soon (gov website states by 2030 but it could be before this)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What is an EPC?
How is it assessed?

A

It rates how energy efficient a building is using grades from A to G.

The energy assessor will look at the age, construction and size of the property.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What are the penalties for not meeting MEES Requirements?
Residential and Commercial

A

Residential - up to £5000 fine

Commercial - Penalty based on rateable value - between £10,000 and £105,000

24
Q

How long is an EPC valid for ?

25
Who can carry out an EPC Assessment
An accredited Energy Assessor
26
What accreditation should an Electrician have?
The National Inspection Council for Electrical Installation Contracting (NICEIC) Assessment- sample of their work, premises, documentation, equipment and supervisory staff. Regular re-assessments
27
What are the Exemptions for an EPC? How long do they last?
5 years High Cost Exemption - smallest improvement is over £3,500 7 Year Payback - where savings do not outweigh the cost of payback over 7 years regulation 28 (3)-(8) All Improvements Made - All energy efficiency improvements have been made and property remains below E Wall Insulation - where wall insulation would be detrimental to properties fabric or structure Consent - Where third party consent i.e. planning is required and refused. Devaluation - RICS valuation stating OMV reduces by over 5% New Landlord - 6 months if LL becomes LL suddenly
28
Where can EPC Exemptions be Registered? Who can register them?
PRS Exemptions Register LL or their agent
29
What are the EPC Max Spend for Residential and Commercial. What will they increase to?
Residential - £3,500 Increasing to £10,000 Commercial - £5,000 Increasing to £30,000
30
What happens if the LL changes when an exemption is in place?
For F or G rated properties, the exemption will not carry over to the new LL
31
What is included into the how to rent guide?
Right to Rent Checks & Deposit Information about the end of the tenancy - bills, cleaning etc Relevant legislation & places for advice - HFFHH Act 2018 & RICS L & T’s responsibilities Dispute resolution
32
What did you advise your client with regards to the tree removal works at bramhall?
Agreed scope with client Checked approved contractors list - insurance, recommendations, RAMS, Accreditation (arboricultural association), CDM regs Requested quotes and timescales based on scope Reviewed quotes, timescales and reviews from websites and collegues Advised my client which was most appropriate
33
How much did the tree cutting works cost at Bramhall? What were the differences between the quotes?
The instructed quote was circa. £1200 This was in the middle of the quotes recieved
34
How often would you recommend your Client undertake tree surveys? What does a Tree Survey Include?
Every 2-3 years Tree survey will state when next survey required Tree survey plan Tree type, measurements, age Specific management recommendations
35
What did you advise your client in regards to the EPC assessment at Hall Cottage? What are the associated costs?
EPC was an F… needed to be an E -replaced boiler with condensing boiler (also added radiators) £3000 -increased loft insulation to 270mm £500 Works carried out as part of wider pre-letting improvements
36
What terms did you agree for neighbor occupation at Aldermaston?
Term - 1 year Fee - £1 if demanded Notice - 2 weeks at anytime Site - 3.4 Ha (and Plan) Use - Storage of max 1800 wheeled containers at anytime My client remains in possession of key to facilitate day to day access and use of full site as working depot.
37
What repairs did you carry out at Hall cottage? What were the costs?
Kitchen -£4000 Carpets £1000 New Boiler & Radiators - £3000 Increased loft insulation - £500 Decorating - £300 Plumber/builder - £2500 £11,300 in total
38
What were the benefits to your client following the works at Hall Cottage?
The works increased the rent from £900 to £1200 per annum With a total spend of £11,300 the return on investment per year was 31.8%
39
What is a modern letable standard?
Gas safe EICR EPC Smoke and CO saftey Legionella tests Chimney swept Homes (Fitness for human habitation) Act 2018
40
What is the Fire Safety Legislation?
Smoke and Carbon Monoxide (amendment) Regulations 2022
41
What legal responsibilities did you advise your client of in relation to the landowner engagement exercise?
They have legal responsibilities under the Pipeline Safety Regulations 1996: - 13 - maintain in efficient state and working order - 15 - no person shall cause damage - 16 - to ensure no damage, operator must take steps to inform persons of whereabouts
42
What information was included within the landowner engagement correspondence pack?
Includes: - Legislation pipeline is operated under - Landowner responsibilities (PSR 1996 s15 - no person shall cause damage) - Contact information for Exolum - Photos of good practice & common activities which are not allowed targeted towards landowners. - Plan of land showing location of pipeline
43
What is the relevant accreditation for Tree Contractors? What are the requirements for the accreditation? Any other qualifications
Arboricultural association Membership To be a Professional member they will have completed a level 5 qualification in Arboriculture Chainsaw Certificate
44
What were the risks to your client if the neighbor had continued occupying the depot without an agreement?
Claim for Adverse Possession 10 years - Registered 12 years - Unregistered Land Registration Act 2002 - Trigger notification to registered LO, they are able to object.
45
What are a landlords responsibility in relation to Fire Safety?
Smoke alarm on each storey CO alarm in any room with solid fuel burning appliance Alarms replaced when not working Any furnishings provided are fire safe Access to escape routes HMO - fire alarms and extinguishers
46
What is the penalty for not complying with the Fire Safety requirements as a LL?
Up to £5,000 fine
47
What are LL responsibilities in relation to Tenant's Deposits When do these responsibilities apply from?
LL must register Tenant's deposits within 30 days with a government approved tenancy deposit scheme All AST's commenced after 6 April 2007 Max 5 weeks rent
48
What is the penalty for non-compliance with Tenant Deposit Requirements
Court can award the tenant up to 3x the value of the deposit Also affects s21 notice
49
What accreditation would you expect gas contractors to have? How do they get this?
To be on the Gas Safe Register and have a Gas Safe ID Card Annual Renewal Relevant qualification and evidence of competence Info on Gas Safe Register website
50
What accreditation would you expect plumbers to have? How do they get this?
Chartered Institute of Plumbing and Heating Engineering (CIPHE) Register of Plumbing Professionals Register of Heating Professionals City & Guilds Craft Certificate and extensive practical experience
51
What due diligence did you carry out prior to the tree works at Aldermaston
TPO Checks
52
How have you applied your RICS rules of conduct to the work you carried out at Barnfields Bungalow ?
I promoted trust within the profession by providing advice on the documents that would be required, and delivered these in a timely manner to ensure my client conformed with the necessary legislation
53
What would you do if the Gas Safety Check engineer could not carry out the works required?
It would depend on the works required - are they mandatory or advisory. I would advise the tenant and try to find someone to carry out the required works, or look to move the tenant out.
54
Why did you not advise a lease at Aldermaston?
Because the occupier wouldn't have exclusive possession
55
What is a principal contractor? Can you take this role?
A principal contractor is someone who takes responsibility for the H&S of the works onsite. I could not do this role.
56
What is the principal designer?
The principal designer is the person that takes charge of the project during the pre-construction phase. This can be the same person as the principal contractor.
57
What would you say is an acceptable rate for storage if your client was interested in the monetary aspect of the Aldermaston agreement?
£3/m2