Private Dwellings tools and positions Flashcards
Private Dwellings
At a private dwelling, which ladder company ENSURES flat roof ventilation and Ensures the cellar is examined for fire?
Private Dwellings
2nd due ladder company
Private Dwellings
Who shut down utilities at private dwelling?
Private Dwellings
Second to arrive ladder company
Private Dwellings
If the second arriving ladder company will not arrive within a reasonable time, have members _______________
Private Dwellings
Conduct and interior search of the floor above
Private Dwellings
The ladder company officer conducting a search and examination on the fire floor in a private dwelling should be the only one to initiate the request for additional ventilation _____
Private Dwellings
On that floor
Private Dwellings
Members Of The First Ladder Outside Team Should Initiate Removal Of Window Bars On Both The ___ and _____ Of The Building Early In The Operation, If Conditions Allow
Private Dwellings
Front and Rear
Private Dwellings
Members proceeding to the side or rear must VISUALLY EXAMINE Cellar Windowsto determine interior fire conditions. All observations must be reported to the ________
Private Dwellings
Ladder company officer AND IC
Private Dwellings
Peaked Roof
1st LCC tools and position?
Private Dwellings
Front/Side
Appropiate size ladder to reach UPPER FLOORS
Private Dwellings
Peaked Roof
Prior to entry and search 1st LCC teams up with ____
Private Dwellings
2nd LCC
Private Dwellings
In situations where size up indicates an obvious occupied attic, the first ladder chauffeur, when teamed up with the second ladder chauffeur, or another available member, may utilize the aerial ladder or tower ladder to perform VEIS of the attic area.(T/F)
Private Dwellings
True
Private Dwellings
Peaked Roof
1st due Roof/OV team Conducts a quick survey around the perimeter of the dwelling for occupants in need of immediate rescue.Communicate and coordinate any rescue attempt with the Ladder Company Officer. If there is no visible life hazard, perform VEIS of an area on an UPPER FLOORthat is _______
Private Dwellings
most Likely to be occupied
Private Dwellings
Peaked Roof
1st AND second due OV/ROOF teams tools?
Private Dwellings
Portable Ladder + 6’ Halligan Hook And/Or Halligan For Each Member
Private Dwellings
PRIOR to using the aerial ladder the Roof and/or OV firefighters shall _____
Private Dwellings
Conduct a quick survey around the perimeter
Private Dwellings
Peaked Roof
The 1st LCC team up with whom for veis of upper floors?
Private Dwellings
The second due LCC
Private Dwellings
When The First Arriving Roof/OV Team Is Using The Aerial Ladder OR TOWER LADDER For VEIS,The Second Arriving Roof/OV Team Shall Survey The Sides And Rear Of The Building And WILL OPERATE With Portable Ladders On Upper Floors In Areas With The Greatest
______
Private Dwellings
Possible LIFE HAZARD
Private Dwellings
When does the second to arrive ladder officer examine the exposure for possible extension?
Private Dwellings
At TOP FLOOR FIRES in ATTACHED private dwellings