Private Dwellings tools and positions Flashcards
Private Dwellings
At a private dwelling, which ladder company ENSURES flat roof ventilation and Ensures the cellar is examined for fire?
Private Dwellings
2nd due ladder company
Private Dwellings
Who shut down utilities at private dwelling?
Private Dwellings
Second to arrive ladder company
Private Dwellings
If the second arriving ladder company will not arrive within a reasonable time, have members _______________
Private Dwellings
Conduct and interior search of the floor above
Private Dwellings
The ladder company officer conducting a search and examination on the fire floor in a private dwelling should be the only one to initiate the request for additional ventilation _____
Private Dwellings
On that floor
Private Dwellings
Members Of The First Ladder Outside Team Should Initiate Removal Of Window Bars On Both The ___ and _____ Of The Building Early In The Operation, If Conditions Allow
Private Dwellings
Front and Rear
Private Dwellings
Members proceeding to the side or rear must VISUALLY EXAMINE Cellar Windowsto determine interior fire conditions. All observations must be reported to the ________
Private Dwellings
Ladder company officer AND IC
Private Dwellings
Peaked Roof
1st LCC tools and position?
Private Dwellings
Front/Side
Appropiate size ladder to reach UPPER FLOORS
Private Dwellings
Peaked Roof
Prior to entry and search 1st LCC teams up with ____
Private Dwellings
2nd LCC
Private Dwellings
In situations where size up indicates an obvious occupied attic, the first ladder chauffeur, when teamed up with the second ladder chauffeur, or another available member, may utilize the aerial ladder or tower ladder to perform VEIS of the attic area.(T/F)
Private Dwellings
True
Private Dwellings
Peaked Roof
1st due Roof/OV team Conducts a quick survey around the perimeter of the dwelling for occupants in need of immediate rescue.Communicate and coordinate any rescue attempt with the Ladder Company Officer. If there is no visible life hazard, perform VEIS of an area on an UPPER FLOORthat is _______
Private Dwellings
most Likely to be occupied
Private Dwellings
Peaked Roof
1st AND second due OV/ROOF teams tools?
Private Dwellings
Portable Ladder + 6’ Halligan Hook And/Or Halligan For Each Member
Private Dwellings
PRIOR to using the aerial ladder the Roof and/or OV firefighters shall _____
Private Dwellings
Conduct a quick survey around the perimeter
Private Dwellings
Peaked Roof
The 1st LCC team up with whom for veis of upper floors?
Private Dwellings
The second due LCC
Private Dwellings
When The First Arriving Roof/OV Team Is Using The Aerial Ladder OR TOWER LADDER For VEIS,The Second Arriving Roof/OV Team Shall Survey The Sides And Rear Of The Building And WILL OPERATE With Portable Ladders On Upper Floors In Areas With The Greatest
______
Private Dwellings
Possible LIFE HAZARD
Private Dwellings
When does the second to arrive ladder officer examine the exposure for possible extension?
Private Dwellings
At TOP FLOOR FIRES in ATTACHED private dwellings
Private Dwellings
Flat roof
1st due Roof FF tools?
Private Dwellings
Halligan,halligan hook,LSR
Private Dwellings
Life Saving Rope Should Be Taken To The Roof When There Will Be A Delay In Laddering The Rear Of The Building Due To Attached Exposures
AND/OR
____________
Private Dwellings
The HEIGHT of the building requires an LSR
Private Dwellings
FLat Roof
If Conditions Negate The Use Of The Aerial, Tower Ladder, Or Portable Ladder, Another Option Is To Take The _______
Private Dwellings
Sissor ladder to an attached uninvolved exposure top floor and gain access to the roof via the scuttle
- do not use the immediate attached exposure in a WOOD frame (Cockloft involvement)
Private Dwellings
For Attached Private Dwellings, When Ladder Rescue Is Not Required At The Front Of The Building, The 1st OV Shall Immediately Make Their Way To The ____
Private Dwellings
Rear
Private Dwellings
Flat Roof
2nd due Roof FF tools?
Private Dwellings
halligan HOOK & SAW
- Assist in roof ventialtion
Private Dwellings
For Cellar And First Floor Fires, The Roof/OV Team Of The FIRST Arriving Ladder Company Will Conduct A Survey Around The Perimeter Of The Dwelling For Occupants In Need Of Immediate Rescue. If No Visible Life Hazard Is Found, They Shall VEIS The Cellar Windows And Assist In Searches (T/F)
Private Dwellings
False. FIRST FLOOR WINDOWS, NOT cellar windows
Private Dwellings
Flat Roof
2nd due OV
In Attached P.D.’S, Except For Assisting Chauffeur In Front Of The Building When Aerial Or Portable Ladders Are Needed For Rescue Or Removal, Check Rear To Ensure Ventilation Has Been Completed. IF NECESSARY, TEAM-UP WITH ______ to check _____
Private Dwellings
2nd LCC
IDLH Exposures
Private Dwellings
If the exposed building is an IDLH area, the chauffeur must team up with the ____ or another available member before entering
Private Dwellings
2nd Due OV
Private Dwellings
For Top Floor Fires With Exposure Problems, The Chauffeur May Be Used To _______.
Private Dwellings
Examine an exposure
Private Dwellings
When The OV And Chauffeur Of The First Arriving Ladder Have Teamed Up, oThen The OV And Chauffeur Of The Second Arriving Ladder Should Team Up.VEIS Areas On An UPPER FLOOR Not Covered/Searched By The First Arriving OV/Chauffeur
(T/F)
Private Dwellings
TRUE