Class 2 High Rise Multiple Dwelling tools and positions Flashcards
CL2R
Whether or not the stairway is an IDLH, ___ members must be assigned to vent the roof
TWO
- 1st roof and a member of FE team or 2nd roof
CL2R
1st due Roof FF tools?
Halligan,Maul/Axe+Hydra Ram
CL2R
1st due Chauffeur tools?
Whatever he or she deems necessary
CL2R
1st due LCC
When outside operations are not feasible or required, the LCC may ______ or _______.
Team up with inside team
Locate secondary entrances to fire apartment or additional stairways/hallways serving them
CL2R
For a *Top Floor Fire the ____________ will ENSURE the curtain is brought to the roof
2nd arriving ladder officer
CL2R
2nd due OV
If elevator operations are not required, they should report to their officer for assignment which may include::
- Assist with the search of the fire apartment
- Assist with search of apartments on the FLOOR ABOVE
- Assist with LSR Rescue or KO deployment
CL2R
2nd due Roof FF tools?
Halligan,halligan hook,LSR+life belt
CL2R
2nd due roof FF duties if LSR rescue if not required?
proceed to the roof to assist the 1st Roof firefighter with ventilation of the attack stairway bulkhead, and search of the bulkheads and the perimeter of the building.