does lightweight construction have to be entered into CIDS?
What is the major weakness of PD’s
Yes it must be in cids
the open unenclosed stair is the major weekness
PD
T/F
flat or peaked roof must be transmitted with the 10-75
True
PD
how does the 1st line enter the building at 1st floor fired?
floors above 1st floor?
Thru the main entrance for both
PD
smoke from windows or louvered vents may indicate what?
cellar fire
PD
fire in a cellar, where does the 1st line enter the building?
via the entrance door that provides quickest access.
PD, when 2 lines are operating, where will the 3rd line be?
stretched and charged at front of building
PD
when should you consider using a 2 1/2” line (2)
1- wind impacted fire
2-heavy fire on first floor of lager PD’s (queen ann)
PD
when do we use bilco doors?
when using a line on the exterior do you start at top or bottom? and do you operate into windows?
bilco doors if only option
start at top and do not operate into windows
PD
who should check the cellar for fire origin?
1st ladder, notify 2nd if unable
PD
what is the paramount concern when deciding to advance a line down the cellar stairs
member safety
PD
who normally cuts the peaked roof?
2nd ladder
*straddle peak, hole is 2x3” and on the LEEWARD side of ridge
PD
flat roof PD, tool assignment for 1st and 2nd roof?
1st- LSR, halligan, halligan hook
2nd- halligan hook and saw
PD
top floor fire with exposure problems where does the 2nd due truck operate
can inspect exposure, LCC can to but if IDLH must team up
PD
who can back out a line?
Chief or acting Chief
*urgent message and truck on 1st floor must back out
PD
who ensures the cellar is checked and shuts down utilities
2nd ladder