Q

PD
does lightweight construction have to be entered into CIDS?
What is the major weakness of PD’s

A

Yes it must be in cids

the open unenclosed stair is the major weekness

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

PD
T/F
flat or peaked roof must be transmitted with the 10-75

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

PD
how does the 1st line enter the building at 1st floor fired?
floors above 1st floor?

A

Thru the main entrance for both

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

PD

smoke from windows or louvered vents may indicate what?

A

cellar fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

PD

fire in a cellar, where does the 1st line enter the building?

A

via the entrance door that provides quickest access.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

PD, when 2 lines are operating, where will the 3rd line be?

A

stretched and charged at front of building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

PD

when should you consider using a 2 1/2” line (2)

A

1- wind impacted fire

2-heavy fire on first floor of lager PD’s (queen ann)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

PD
when do we use bilco doors?

when using a line on the exterior do you start at top or bottom? and do you operate into windows?

A

bilco doors if only option

start at top and do not operate into windows

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

PD

who should check the cellar for fire origin?

A

1st ladder, notify 2nd if unable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

PD

what is the paramount concern when deciding to advance a line down the cellar stairs

A

member safety

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

PD

who normally cuts the peaked roof?

A

2nd ladder

*straddle peak, hole is 2x3” and on the LEEWARD side of ridge

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

PD

flat roof PD, tool assignment for 1st and 2nd roof?

A

1st- LSR, halligan, halligan hook

2nd- halligan hook and saw

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

PD

top floor fire with exposure problems where does the 2nd due truck operate

A

can inspect exposure, LCC can to but if IDLH must team up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

PD

who can back out a line?

A

Chief or acting Chief

*urgent message and truck on 1st floor must back out

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

PD

who ensures the cellar is checked and shuts down utilities

A

2nd ladder

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

T/F
PD cellar fire, the truck should proceed to the same entrance as the first hoseline, to provide entry for the engine company. once the cellar fire is controlled, the inside team is in position to perform VEIS.

A

TRUE

17
Q

PD

cellar fire, if the engine is using the interior stairs, who does the primary on the first floor?

A

the 1st truck.

*if engine is having problems and needs assistance 1 member of inside team will help with the stretch

18
Q

PD

what is the preferred position for a TL

A

parallel to front of building

19
Q

PD

peaked roof when only portable will be used where does the LCC operate?

A

front or sides, not rear

20
Q

PD

at a queen ann who does roof ventilation?

A

a later arriving unit

21
Q

PD

multiple family- fire on the first floor, where does the 1st ov roof team operate?

A

1st floor,

22
Q

Traditional PD’s collapse after about __hr(s). with no ceiling they will collapse in about ___min. light weight construction in __-__min

A

traditional 1 hr. no ceiling 20min. lightweight construction 5-10 min

23
Q

T/F

lightweight PD under construction-exterior operation unless fire is minor or confined to a small area

A

true