Prep CO 2 Flashcards
What are the benefits of using valuated sales order stock compared to non-valuated sales order stock? 2 antwoorden
Simplified inventory value determination
Combined quantity and value flow analysis
Production order settlement to sales orderS
Production cost calculation
Simplified inventory value determination
Combined quantity and value flow analysis
What does the calculation of a condition type in the costing sheet of CO-PA depend on? 2 antwoorden
Condition class
Valuation
Segment
Calculation type
Condition class
Calculation type
When you create a planning layout, which objects can you use to define the data columns? 3 antwoorden
Distribution key
Formulas
Value fields
Summarization level
Characteristics
Formulas
Value fields
Characteristics
During posting, from which object does the system first derive the profit center if the profit center is NOT directly assigned to a network activity?
Network header
Project definition
Dummy profit center
WBS element
WBS element
Which of the following statements best describe Product Cost by Period? 2 antwoorden
It is used for joint production with process orders.
It is used in conjunction with a product cost collector.
It is used to analyze work in process based on actual costs.
It is used when the focus of controlling is on a stable and continuous production process.
It is used in conjunction with a product cost collector.
It is used when the focus of controlling is on a stable and continuous production process.
Where can you find actual transaction data of account-based CO-PA in SAP S/4HANA?
ACDOCA
COEJ
CE1XXXX
BSEG
ACDOCA
When trying to assign a profit center to a new cost center, you receive an error. What can cause this error?
The profit center has already been assigned to a different cost center
The validity period of the cost center is shorter than that of the profit center
The validity period of the profit center is shorter than that of the cost center
The lock indicator is activated in the profit center master record
The validity period of the profit center is shorter than that of the cost center
Which criteria do you use to specify the G/L account for the work in process (WIP) settlement? 3 antwoorden
Results analysis method
Results analysis cost element
Results analysis category
Results analysis profit center
Results analysis version
Results analysis cost element
Results analysis category
Results analysis version
Which process determines the target costs of the cost object in a product cost by order scenario?
Accrual calculation
Work in progress (WIP) calculation
Actual costs calculation
Variance calculation
Variance calculation
For which of the following situations would you need to implement the transfer price solution in SAP S/4HANA?
Parallel price calculation and invoicing are needed to facilitate intercompany reconciliation.
Parallel accounting is needed in order to be compliant with different accounting principles.
Parallel valuation views of the same logistical flows are needed to differentiate between legal and profit center valuation.
Parallel costing is needed in order to calculate separate costs of goods manufactured for different accounting principles.
Parallel valuation views of the same logistical flows are needed to differentiate between legal and profit center valuation.
Which of the following objects can be selected in templates for activity-based costing? 2 antwoorden
WBS element
Cost center/activity type
Business process
Internal order
Cost center/activity type
Business process
What tasks are performed by the system during activity allocation? 2 antwoorden
The cost element is derived from the master data for the activity type
The allocation amount is calculated based on the quantity and price of the activity
The sender cost object is debited and the receiver cost object is credited
A primary costs G/L account is used for debiting and crediting
The cost element is derived from the master data for the activity type
The allocation amount is calculated based on the quantity and price of the activity
When do you use an assessment instead of a distribution? 2 antwoorden
When you want to consolidate allocated expenses
When you need the option to reverse the cycle as often as required
When you need to transfer secondary costs
When you want to view the original cost elements on the receiver
When you want to consolidate allocated expenses
When you need to transfer secondary costs
To which object do you assign a costing sheet?
Valuation variant
Costing variant
Cost component structure
Transfer control
Valuation variant
In a standard system delivery, how many characteristics can be added to an operating concern?
101-150
71-100
Over 150
0-70
0-70
What can you define for a user status in the status profile?
The business user IDs authorized to change the user status
The versions for which you can enter plan data
The order types for which a user status is valid
The assigned user status after a business transaction is executed
The assigned user status after a business transaction is executed
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use?
Costing version
Transfer control
Costing type
Reference variant
Reference variant
Which of the following controls can you set when you determine a characteristic derivation? 3 antwoorden
Valuation calculation
Display authority
Overwriting authority
System response when unsuccessful
Conditions for execution
Overwriting authority
Conditions for execution
System response when unsuccessful
What are some of the characteristics of internal order planning? 2 antwoorden
Tolerance limits are defined.
Availability control is checked.
Multiple versions are allowed.
Costs are entered.
Multiple versions are allowed.
Costs are entered.
How does SAP S/4HANA determine if a characteristic value is valid in Profitability Analysis?
By defining the characteristic value as a value field
By defining the characteristic value in the field catalog
By defining the characteristic value as a key figure
By defining the characteristic value in the check table
By defining the characteristic value in the check table
At which level do you define the valuation method for results analysis?
Controlling area
Company code
Sales organization
Operating concern
Controlling area
Which views can you use to analyze the costing results within the costing run tool? 3 antwoorden
Analysis report
Material list report
Costing levels report
Variance report
Work in progress report
Analysis report
Material list report
Costing levels report
Which statement best describes a cost center standard hierarchy?
It is grouped together with alternative hierarchies to represent decision control and responsibility units.
It represents an organizational unit in SAP S/4HANA where the costs and revenues are incurred and reported.
It is a structure to which all the cost centers within a controlling area are assigned.
It enables you to assign the same attributes to similar cost centers within a controlling area.
It is a structure to which all the cost centers within a controlling area are assigned.
What master data objects can you set up using time-based fields? 2 antwoorden
Standard hierarchies
Activity types
Cost centers
Statistical key figures
Cost centers
Activity types
Which of the following statements are applicable to SAP S/4HANA embedded analytics? 2 antwoorden
It uses core data services (CDS) views to create virtual data models (VDMs) for reporting.
It is part of the core SAP S/4HANA license and uses the same technical stack and user interface.
It is used by dedicated BI users who need to go beyond the capabilities of Strategic Analytics Tools for reporting.
It is part of SAP S/4HANA Strategic Analytics tools stack that uses virtual data models for reporting.
It is part of the core SAP S/4HANA license and uses the same technical stack and user interface.
It uses core data services (CDS) views to create virtual data models (VDMs) for reporting.
It uses core data services (CDS) views to create virtual data models (VDMs) for reporting. 3 antwoorden
Costing version
Production version
Transfer control
Valuation variant
Costing variant
Costing version
Transfer control
Costing variant
You define rules in a status profile and assign the profile to your internal order type. What do you use the status profile for? 3 antwoorden
To set the initial status as Created or Released
To activate the CO partner update
To define users for the order
To permit or forbid specific transactions
To define the user status
To set the initial status as Created or Released
To permit or forbid specific transactions
To define the user status
Which objects do you use when you assign costs and revenue to the value fields in costing-based CO-PA?
Overhead group
Allocation structure
Transfer structure
Allocation template
Transfer structure