Pre Test Review Flashcards

1
Q

What are the at power trips blocked by P7?

A

PRZ Pressure Low

PRZ Water Level High

RCS Loss of Flow

UV on RCP Busses

UF on RCP Busses

RCP Breaker Position

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the inputs to OT Delta T?

A

Delta T

Tave

AFD

PRZ Press

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What does OT Delta T Protect from?

A

DNB

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the inputs for OP Delta T?

A

Delta T

Tave

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What does OP Delta T protect from?

A

KW / Ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What starts the CEQ Fans?

A

1 psi in Containment.

NOT Phase A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the function of P4?

A

+ Low Tavg = FWI

Permits manual block of auto SI Signals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the setpoints for P6 while going up in power?

A

10-10 Amps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the setpoints for P6 coming down in power?

A

6 x 10-11 amps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When does the SR Hi flux at SD alarm blocked clear?

A

10-10 amps

P6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the 4 functions of P10?

A

Permits manual block of:

  1. PR Hi Flux Trip, Low Setpoint
  2. IR Trip
  3. IR Rod Stop

Also is the backup de-energization of SR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which rod stops are for auto and manual rod withdrawal?

A

C1

C2

C3

C4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How are rods affected during a PR NI failure - High?

A

Rods insert and will not withdraw bc of C2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is C9?

A

1 Circ Pump Breaker Closed

CRID II

3/3 Condenser Vac >= 20.6 “Hg

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When is AMSAC enabled?

A

2/2 Turbine Impulse Pressures >40%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When is the runback of the MFP enabled?

A

> 60% power ish. Actually based on the auto dp setpoint for mfps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is the only pressurizer level failure that will not cause a trip with no operator action?

A

Bistable fails high

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

While PRZ Heaters be protected during a cooldown?

A

No. Actual level will be less than 17% when indicated on the hot cal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What is the TRM Temperature for aux spray delta T?

A

320*F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Which pressure channel inputs into QMO-225, East CCP ELO?

A

NPP-151

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Which pressure channel inputs into QMO-226, West CCP ELO?

A

NPP-153

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What must be done if SDM is not within the COLR limits?

A

Borate to restore within 15 mins

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What is QLC-451, VCT Level control primarily responsible for?

A

Makeup

Starts at 14%. Stops at 24%

Divert trips open at 87%

Has high, Low and Low low alarm. As well as MU Not in Auto

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What is QLC-452, VCT Level control primarily responsible for?

A

Divert

Starts at 78%. Full open at 87%.

Has Low and Low Low alarm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

The turbine trip controller maintains temperature at ______ using a maximum of _____ groups of valves.

A

547*F

2 Groups

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

How many groups of valves are available for a load rejection?

A

2 groups for C7A

3 groups for C7B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

How do you know how many groups of valves are open on a turbine trip?

A

Temperature.

10*F differential = 1 group trips open

20*F differential = 2nd group trips open

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

How many groups are available in steam pressure mode below 541*F?

A

1 group after going to bypass

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

What is the ECCS Acceptance Criteria?

A

Peak Clad Temp < 2200*F

Max Clad Oxidation < 17%

H2 generation < 1% max

Coolable geometry

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

What are the typical injection pressures and flows for the ECCS Pumps?

A

CCP 2300# 150-550 gpm

SI 1600# 400-600 gpm

RHR 200# 4500 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

What are the tech specs for the accumulators?

A

Volume 921 - 971 cu ft

Pressure 585 - 658 psig

Boron 2400-2600 ppm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

What is QPTR?

A

Max of all Upper (lower) vs Average of all Upper (lower)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

What must be done if AFD is not in target band at > 90% power?

A

15 mins to restore or get below 90% in another 15 mins

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

What must be done if you’re between 50-90% power and AFD is not in the target band?

A

Reduce to < 50% power in less than 30 mins

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

What are the inputs to Rod Control?

A

Auctioneered High Tave

Auctioneered High PR NI

MPC-253

36
Q

How fast do rods move in auto with a 3-5*F mismatch?

A

8-72 spm

32 steps per degree + 8

37
Q

What do you do if you’re outside of the ARM?

A

1 rod out, borate to SDM in 1 hr, power to 75% in 2 hrs

> 1 rod out, borate to SDM in 1 hr or M3 in 6 hrs

38
Q

What 3 things go into determining which Mode we are in?

A

Keff

% Rated Thermal Power

RCS Tave

39
Q

How many RCS / RHR Loops need to be operable in M4?

A

Any combo of 2 RCS / 2 RHR Loops

40
Q

In Mode 5 with loops filled, what are the RHR requirements?

A

2 RHR Loops operable

OR

1 RHR Loop operable and 2 SGs

41
Q

In Mode 5 with Loops Drained, what are the RHR requirements?

A

2 RHR Loops Operable, with 1 I/S

42
Q

What are th RHR Requirements in Mode 6 > or = to 23 ft?

A

1 RHR Loop Operable

43
Q

What are the RHR Requirements in Mode 5 when < 23 ft?

A

2 RHR Loops Operable with 1 I/S

44
Q

What are the inputs into the Subcooling Meter?

A

Auctioneered High CETCs or WR RTD Temps

Auctioneered LO RVLIS pressure

45
Q

What must be done if Tave is < 541*F while critical?

A

Be in M2 w Keff < 1 in 30 mins

46
Q

What must be done with reactor critical when Tave is < 539*F?

A

Immediately place in subcritical position

47
Q

What is the heat up rate?

A

60*F / hr

48
Q

What is the cooldown rate?

A

100*F / hr

49
Q

What must be done if ou are outside of your cooldown rate in modes 1-4?

A

Restore within 30 mins due to brittle fracture concerns

50
Q

Why is 600 gpm RHR flow sent to L2&3 during a cooldown?

A

TO keep L3 subcooled during a PRZ Outsurge

51
Q

Which RHR pump supplies suction to SI Pumps on CL Recirc?

A

West

52
Q

Which RHR Pump supplies suction to the CCPs during Recirc Phase?

A

East

53
Q

What are the containment temperature limits?

A

Lower = 60-120*F

Upper = 60-100*F

54
Q

What are the containment pressure limits?

A

-1.5 psig to +0.3 psig

55
Q

What are the U1 SG Low and Low Low trips?

A

15% and 5%

56
Q

What are the U2 SG Low and Low Low Trips?

A

26% and 22%

57
Q

What are the EDG trips during a SI or LOOP?

A

Generator Phase Differential

Electronic Overspeed

Manual PB

58
Q

What is the purpose of raising load to 900-1100 KW quickly after closing the DG output breaker?

A

Prevents motoring the EDG due to no-load conditions

59
Q

What will give a Load Cons signal?

A

LOOP and SI (on same train)

Or

LOOP and CTS (on same train)

60
Q

What is considered a High Rad area?

A

100-1000 mrem in 1 hr at 30 cm

61
Q

What is considered a Locked High Rad area?

A

> 1000 mrem in 1 hr at 30 cm

62
Q

WHat is considered a contamination area?

A

1000 DPM beta gamma on 100 sq cm

Or

20 DPM / 100 sq cm of alpha

63
Q

What is considered a HIGH contamination area?

A

> 100,000 DPM / 100 sq cm

64
Q

What are the 10CFR20 Limits for TEDE?

A

5 R / yr

65
Q

What are the admin limits at cook for TEDE?

A

2 R / year

66
Q

Which rad monitors cause a CVI?

A

Upper containment

VRS-1101/1201

Lower will too. But not channel 10s

67
Q

Which temperature inputs into RPS?

A

NR Thot

68
Q

A load rejection at ______ presents the greater short term challenges due to ______

A

BOL

Lower MTC reactivity feedback allowing for a larger rise in Tave

69
Q

A load rejection at ______ presents the greater long term challenges due to ______

A

EOL

Xenon oscillations

70
Q

XS LD Hx design flow is ______

A

20 gpm

71
Q

If outside of the RIL (rod bank low low lit), what must be done?

A

Emergency borate

72
Q

If the Rod Bank Low light is like, what does it mean?

A

May be outside AFD.

Achieve thermal power < 50% immediately

73
Q

MFP DP variable setpoint looks at _______

A

Total steam flow

74
Q

PR N42 failing low will have cause what to happen due to delta I changes?

A

Lowers OTDT Setpoint

75
Q

What do amps do on a locked rotor?

A

Rise

76
Q

What does speed do on a sheared shaft?

A

Rise

77
Q

What must you do with 1 stuck rod?

A

Verify SDM in 1 hr

78
Q

What must you do if the TS safety limit for RCS Pressure is exceeded in Mode 1?

A

2735 psig, be in hot standby within 1 hr

79
Q

Why would you suspend additions to GDT when it contains > 43,800 curies noble gas?

A

To prevent an uncontrolled release of contents from exceeding 500 mrem whole body dose at the site boundary

80
Q

WHat is the cutoff dose where the worker must be a volunteer?

A

> 25 REM

81
Q

Which channel of VRS-1500 has automatic actions?

A

1509, HR Noble gas

82
Q

How do you determine a new leak rate?

A

Square root of new DP / Square root of old DP x Original Leakrate

83
Q

Which SR NIs feed into the audible count rate?

A

N31 and N32

84
Q

How does the MT act with MW control IN?

A

Valves move in attempt to maintain load (may draw more steam if needed)

85
Q

If you are at 100 cps on the SR NIs, where are you on IR NIs?

A

~ 10-11

86
Q

How many REM can be received before you start seeing somatic effects?

A

Up to 100 REM