Q

What are the 3 techniques or methods that RE emphasize to reduce energy demand?

A
  1. Passive environmental design 2. Appropriate selection of highly efficient mechanical and electrical equipment 3. Facilitation of renewable energy installation.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the general credit requirement for RE-R1?

A
  1. Energy model, 2. Minimum 12% performance improvement vs baseline performance
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The proposed building performance and baseline building performance shall include which end- use load components?

A

Lighting, Heating, Cooling, Heat Rejection, Pumps, Fans, Service water heating and Receptacle and process loads.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

For Emirates of Abu Dhabi what is assumed condition for weather data?

A

Climate zone 1b “Very Hot and Dry”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How should receptacle and process loads be modelled?

A

It should be identical in both baseline and proposed building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Examples of receptacle and process loads

A

Office equipment, computers, elevators and escalators, kitchen equipment, laundry equipment, water treatment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the seasonal average COP if sufficient data cannot be provided on DC network?

A

COP=4.5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How do renewable energy help in achieving RE-R1?

A

Renewable energy may be subtracted from the proposed building energy consumption including where the energy produced is exported to the electrical grid.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the primary intention of RE-R2?

A

Improve and understand the use of energy in the buildings by using metering facilities for recording and monitoring of energy performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is required of energy sub-meters?

A
  1. Easily accessible; 2. Clearly labelled; 3. Capable of monitoring energy consumption
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

True or False: All onsite energy generating systems must be seperately metered and their annual energy generation recorded.

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Can an ODP >0 achieve RE-R3 credit?

A

No. ODP should be zero.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

True or False: RE-R3 refers only to the the refrigeration system contained within the site boundary.

A

True. District cooling systems which will provide only chilled water to the site are not subject to the requirement of RE-R3.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

A document that should be submitted for both RE-R1 and RE-1 credits.

A

Energy Model Template

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

1 credit point for RE-2 is awarded for roofing materials with what value of SRI?

A

SRI>/= 78

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Considerations to implement passive design measures?

A

Building orientation, fixed shading devices, improvements to building fabric, air tightness

17
Q

What are passive design measures to achieve RE-2?

A

Cooling methods which require no mechanical systems.

18
Q

Defined as the sum of solar gain, external conduction gain and infiltration gain.

A

External heat gain

19
Q

The ratio of the total area of glazing on a façade to the total façade area.

A

Glazing Ratio

20
Q

How are roof areas covered by external shading devices calculated?

A

As portion of roof area in shade measured at 12 pm solar time on the summer solstice.

21
Q

In what instance do RE-3 awarded automatically?

A

When building contains no roof (excluding areas with mechanical plant, vegetated roof and with renewable technologies).

22
Q

A document that is needed to achieve RE-3 requirements.

A

Proof of certification by Energy Star program, EU Energy Efficiency Labeling Scheme or equivalent.

23
Q

What are the equipment considered in RE-4?

A

Stairs, Lifts, Escalators/Travelators

24
Q

What is the CRI value required for lighting used within the stairs?

25
For over 3-storey buildings, what must be include aside from idle/downtime features and LED lighting and LCD display features?
Regenerative Drive System
26
How is the peak and annual average electrical load (MW) determined?
From modeling results of the dynamic simulation undertaken as part of RE-R1.
27
To achieve 1 credit point for RE-6 what is required of the Offsite Systems?
Direct purchase of RECs which will provide a minimum of 20% renewable energy for a minimum 2 years under a contract.
28
What is the required GWP for refrigerants to achieve 1 credit point under RE-7?
GWP
29
What are the possible condition where RE-7credit points are awarded automatically?
1. Total collective mass of refrigerant within the project = 5kg; 2. Only individual units with <5 kg refrigerants used; 3. DC systems complies the requirements of Refrigerants, Refrigerant Leak Detection, and Refrigerant Pump Down; 4. No gaseous fire suppressions systems are used in the project.
30
What are the areas of RE-7 which should be addressed to earn possible points?
Refrigerants, Refrigerant Leak Detection, Refrigerant Pump Down, Fire Suppressions System
31
Under RE-7, which credit section must be used in order to verify Refrigerant Leak Detection and Refrigerant Pump Down operation?
IDP-R3 Basic Commissioning