PQP-IDP Flashcards
Stages of IDP
Design, Construction, Commissioning/Testing, O&M, On going education
What are the benefits of implementing IDP credits?
Establish a more collaborative and iterative design process, Encourage construction activitiies that value workers welfare, quality and sound environmental management, prepare the ground for good O&M where the user plays an infomed active role
What document must be accompanied with IDP-R2?
Lease documents
What is the importance of IDP-R2?
To formally communicate to the future tenants and their design and development teams the requirements for the project in relation to sustainable design and construction.
IDP-R2 is applicable only to what projects?
Core and Shell projects
What is required of Independent Cx Agent as part of IDP-R3?
Report to the project owner; Engaged as part of design team; Min 2 years experience; Can be an employee of one of the companies in the project as long as not involved in the project design and/or contruction
Comprehensive Cx requirements should be included in what documetnts?
Project specifications and construction contracts or provide a Cx Plan
When is Cx Plan provided?
At building construction completion
Who commission the building at completion stage?
Independent Cx engineer
What is included in Cx Plan?
OPR, BOD narrative
What are included in the final Cx report?
OPR, Project cx specifications, Verification of installation, O&M Manual
At what ratng do Cx plan and Cx report submitted?
Cx Plan- Design Rating; Final Cx Report-Construction Rating
What is Cx in terms of effort?
It is a collaborative effort.
Roles played by independent Cx agent
Oversee and lead Cx process; Review design and construction documentations; Prepare or review Cx plan; Review and approve the results of Cx system
Roles of the contractor in Cx
Employ independent Cx contractor; Commence development of BLB
Minimum required systems for Cx process
HVAC-R, onsite energy generation(cogen), Lighting and Lighting controls, Domestic hot and cold water systems, on-site water treatment systems including swimming pools, auto control features such as blinds
When should be the right stage to start LCC analysis?
During concept design
What is the purpose of LCC analysis?
Evaluate and compare various design options
The guest Worker Accomodation Plan should address what?
Provision for accomodation; On going maintenance plan; Inspection schedule and auditing mechanism; formal protocol
What is required of CEMP?
Prepared according to EAD-CEMP Technical Guidance Document and either approved by EAD or peer reviewed by EAD approved and registered consultant
When is the implementation of IDP-5?
Re-commissioning after 1 and 2 years
What should be provided in order to attain additional credit point for IDP-6 aside from Occupant handbook?
Occupant feedback