PQP-LBi Flashcards
What are the primary considerations for credit section Lbi?
Healthy Ventilation, Healthy Materials, Healthy Indoors
How is improving occupant health and well being through improved indoor environmental quality foster economic growth?
It results to productivity gains, staff retention and reduced absenteeism of occupants.
What are the intention of Lbi-R1?
- Protect air quality drawn into buildings; 2. Ensure minimum delivery of outdoor fresh air.
Under Lbi-R2, what distance around all entrances, outdoor air intakes and operable windows as smoke free zone?
25 m
How are building owner/developer involved in achieving Lbi-R2?
Inclusion in Contract of Sale and Lease/ Rent Agreement the written commitment by the building owner/ developer to implement a no smoking policy within the building.
What are included in Legionella Management Plan?
Risk ID and Assessment; Risk Mgt. Plan, Exposure Risk Prevention or Control Plan, Record Keeping Plan, Responsibility Plan
What is required to achieve 2 credit points through mechanical ventilation under Lbi-1?
Installation of CO2 monitoring and alert system; 15% in outdoor air ventilation above the rate established in Lbi-R1
What is the maximum allowable CO2 level?
1000 ppm
What are the items covered in the material emissions credit?
Adhesives and Sealants; Paints and Coatings; Carpet & Hard Floorings; Ceiling Systems; Formaldehyde Reductions
The minimum compliance of Adhesives and Sealants is measured by _________.
Weight
Lbi-2.1 must comply with what reference guide?
SCAQMD 1168
How many percent should Lbi-2.1 and Lbi-2.2 for VOC limits must be compliant for Schools?
100%
The minimum compliance of the of Lbi-2.2 and Lbi-2.3 for VOC limits is measured by _________.
Surface Area
How is Lbi-2.3 associated with Lbi-2.2?
Any adhesives and sealant used with carpet, carpet cushions or hard floorings should meet Lbi-2.1
Reference standard used for Carpets, Carpet Cushion, Hard flooring and Wood Flooring
Carpet and Carpet Cushion: CRI Green Label, CRI green Label Plus or Greenguard IAQ Certification Program for Carpets; Hard Flooring: FloorScore Certification or Greenguard IAQ Certification Program; Wood Flooring: BS EN 14342:2005
Common requirement for woods used as flooring and ceiling.
- Do not exceed class E1 for formaldehyde content; 2. Do not exceed 5 ppm PCP content
What are the items covered in LBI-2.5 to achieve maximum of two credit points?
Internal construction Materials and Installed Furniture
What are the minimum items which should be addressed in Construction IAQ Management Plan?
Source control; Building Flush Out; Resuming Normal Building Operation
This is the region within an occupied space between 1 and 1.8 m above the floor and ore than 0.1 m from walls or air conditiioning equipment
Breathing zone
Where is the most appropriate location of the monitoring system for air quality as required by LBi-4?
Breathing zone
75% enclosure
A car park with a roof and 75% of the wall area perimeter enclosed.