1
Q

What are the credits under NS?

A

see page 31

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the important aspects of NS credit?

A

Encourage natural resource management and sustainable land use.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is green gradient?

A

It designates level of conservation, preservation and restoration, and development of five zones, ranging from most intensely developed urban core to the natural areas that must be preserved.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The concept and policy objectives for green gradient are defined in?

A

Coastal Development Guidelines by UPC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the hierachy being followed by NS credit section?

A
  1. Protect 2. Enhance 3. Restore
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Assessment of NS should be caried out on?

A

Project site Area of probable impact surrounding the project; sub regional and regional scale

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What must be prepared to guide the design of the development?

A

KPI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Measurable targets against which future design or construction works can be assessed refers to _______.

A

KPI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are true about KPI?

A
  1. must be prepared to guide the design of the development; 2. must include indicators and targets relating lto soil, flora, fauna, etc. ;3. simple, clear, measurable targets against future design or construction works can be assessed; 4. need to be site specific and reflec the particular attributes of the site
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The Physical area within which activities of the project will take place.

A

Project Site Area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The extent of the physical area occupied by an environmental component that is likely to be impacted by at least one of the phases of the proposed project.

A

Area of the probable impact

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the strategies for NS-R2?

A

Protection; Onsite Mitigation; Offsite Compensation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the 3 strategies of NS-R2?

A

Protection, Onsite Mitigation, Offsite Compensation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

It is intended to minimize the demand for resources, promote soil protection and enhancement and long term survival and management of landscape and habitat areas.

A

NS-R3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What type of plant should be considered in plant selection?

A

Only native and adaptive drought and saline tolerant species

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Any land that is or was occupied by a permanent structure including the land up to the plot boundary of the permanent structure and any associated fixed surface infrastructure.

A

Previously Developed Land

17
Q

True or False. Previously Developed Land includes agriculture or forestry and any parks or recreational grounds.

A

False. see page 41.

18
Q

Which ESA determines the remedial steps to be taken to decontaminate , or safely encapsulate, the site prior to construction?

A

Phase III

19
Q

Plant species not included in NS-3 requirements?

A

Invasive plants

20
Q

It will link habitat creation/ restoration sites to similar habitat types located near but beyond the site.

A

Ecological Corridor

21
Q

Examples of Priority Habitats

A

Intertidal Mudflats, Mangroves, vegetated sandy Beaches, Seagrass, Coral, Wadis, sand Sheets and Low Dunes, Interdunal Plains and High Dunes, Alluvial Plains, Jebels

22
Q

When is Onsite Mitigation strategy not applicable?

A

When the Natural System asset to be impacted is located within a protected or proposed protected area or national parl, a coastal park or ecological hotspot, or costal conservation zone, as defined by UPC Coastal Development Guidelines.

23
Q

What is the replacement ratio for on-site/off-site re-establishment of habitat using similar species diversity as the lost habitat?

A

2:1

24
Q

Are species within the Area of Probable Impact need to be protected under NS-R2?

A

No. Only species within the project boundary need to be protected.

25
Q

To qualify for NS-1 credit, what should be the area of the land which is developed?

A

75% of site area

26
Q

What must be followed in order t evaluate hazardous material pollution?

A

site contamination assessment protocol

27
Q

Give an example of site contamination assessment protocol

A

ASTM Environmental Site Analysis Process