Powerplant Limitations Flashcards
Dry motoring required if engine restarts are required between ___ and ___ minutes following an engine shutdown.
15 & 180
(Dry Motor) Crank each engine to ___ or ___ seconds whichever comes first. Wait ___ minutes before starting the engine to allow engine to thermally normalize.
21% 15 & 3
(Dry Motor) Procedure must be repeated if more than ___ minutes has elapsed since the dry crank was performed if still under the ___ minute timeframe.
40 & 180
Maximum crosswind component for engine start:
20 kt
Maximum tailwind component for engine start:
15 kt
Abort engine start if light off does not occur within ___ seconds of start initiation.
30
Abort engine start if no positive oil pressure by ___?
30% N2.
Maximum ITT During Start:
N2 or at or below 40%: 650°C or
N2 above 40%: 950°C
___ consecutive start/crank cycles, followed by cooling period of ___ minutes prior to additional starts and motoring.
3 & 15
Max xwind component for engine start
20 kt
Max tailwind component for engine start
15 kt
Abort engine start if lightoff does not occur within ___ seconds of start initiation.
30
Abort engine start if no positive oil pressure by ___
30% N2.
Maximum ITT During Start:
N2 or at or below 40%: 650°C
N2 above 40%: 950°C
____ consecutive start/crank cycles, followed by cooling period of ___ minutes prior to additional starts and motoring
3 & 15