Potential Environmental Impact of Operating Facilities Flashcards

1
Q

Which of the following, created by operating facilities may
have an adverse affect on the environment:
a) noise generation
b) incomplete combustion
c) planned vapour release
d) solid non-toxic wastes
e) all of the above

A

e) all of the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
A valuable tool in recognition of an environmental problem is
the use of
a) WHMIS
b) TDG systems
c) operating systems
d) reporting systems
e) incident systems
A

a) WHMIS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

New facilities such as compressor stations require

a) a soil impact study
b) an air quality impact study
c) a gas conservation study
d) a noise impact statement
e) a wildlife impact statement

A

d) a noise impact statement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
The first action of plant personnel upon finding unplanned
environmental excursion is
a) to report the incident to OH&S
b) to report the incident to Provincial Environmental
Authorities
c) to report the incident to E.R.C.B.
d) minimize and control the release
e) alert the rest of the plant personnel
A

d) minimize and control the release

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
Who provides the most effective means of problem recognition
in the plant?
a) Occupational Health and Safety
b) operating and maintenance personnel
c) plant superintendent
d) cleaning staff
e) fire marshall
A

b) operating and maintenance personnel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

As a plant ages, changes in operating conditions that affect
the environment are the responsibility of
a) the ERCB
b) the company operating the plant
c) OH&S
d) the Environmental Review Board
e) plant operating personnel

A

e) plant operating personnel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The three types of actions that can result when a problem
area is identified are
a) immediate, medium range, and long term actions
b) permanent, intermediate, and long term actions
c) permanent, interim, and adoptive actions
d) permanent, interim, and adaptive actions
e) short term, adaptive, and long term actions

A

d) permanent, interim, and adaptive actions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
The ability of operating personnel to deal with abnormal
environmental conditions in a timely and efficient manner is
facilitated by
a) incident plans
b) emergency plans
c) adaptive action plans
d) permanent action plans
e) continuous action plans
A

b) emergency plans

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
To lessen environmental incident, operating personnel should
know
a) the material they are dealing with
b) the isolation points in the process
c) what is required to contain a release
d) the problems that an upset in a process may cause to the
environment
e) all of the above
A

e) all of the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
The acceptable design sound level heard at the nearest
permanently or seasonally occupied dwelling would be stated
in the
a) soil impact study
b) wildlife impact statement
c) noise impact statement
d) air quality impact study
e) gas conservation study
A

c) noise impact statement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

“Permanent action”
a) deals with and eliminates the root problem
b) allows you to live with the problem indefinitely
c) is unattainable
d) requires a plan to address the problem at the earliest
opportunity
e) suggests a time frame for follow up

A

a) deals with and eliminates the root problem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The most proficient method of dealing with environmental
impacts due to wastes is to
a) avoid the generation of hazardous waste
b) ensure it conforms with the TDG Act (Alberta)
c) ensure that disposal of material waste confirms with
required legislation
d) conduct periodic inspections of the company used to
dispose of hazardous waste
e) use long term storage

A

a) avoid the generation of hazardous waste

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When decommissioning and abandoning a processing site
a) a site restoration proposal must be done
b) an environmental impact study and a remedial plan must be
made
c) an ERCB approved plan must be implemented
d) an OH&S study must be done
e) a company liability study must be done

A

b) an environmental impact study and a remedial plan must be

made

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Soil contaminated by a hazardous material should be
a) flushed with plenty of water
b) neutralized by an acidic or basic solution
c) removed, placed in sealed containers and disposed of
d) contained within the defined boundary
e) heated to above 500 degrees C to drive off the
contaminants

A

c) removed, placed in sealed containers and disposed of

How well did you know this?
1
Not at all
2
3
4
5
Perfectly