POC REGULATORY STRUCTURE Flashcards

1
Q

WHAT IS THE SIGNIFICANCE OF FERC ORDER 888

A

C- IT REQUIRED TRANSMISSION OWNERS TO OFFER NONDISCRIMINATORY ACCESS TO THEIR TRANSMISSION LINES AND GAVE OPEN ACCESS TO SUPPLIERS OF THE BES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

WHAT YEAR DID FERC REFORM THE OPEN ACCESS RULE

A

C- 2007

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

CIRCLE DWRS 5 CURRENT NERC REGISTRATIONS

A

-GOP
-GO
-RP
-TO
-TP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

THE NATIONAL ELECTRIC RELIABILITY COUNCIL WAS ESTABLISHED IN RESPONSE TO WHAT

A

D-THE 1965 BLACKOUT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

WHAT CAME OUT OF THE 2003 BLACKOUT

A

THE RECOMMENDATION THAT RELIABILITY STANDARDS BECOME MANDATORY AND ENFORCEABLE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

WHAT IS FERC RESPONSIBLE FOR

A

-LICENSING OF HYDROELECTRIC PLANTS
-OVERSEEING MERGERS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

WHAT HAPPENED IN JUNE OF 2007

A

COMPLIANCE WITH APPROVED NERC RELIABILITY STANDARDS BECAME MANDATORY AND ENFORCEABLE IN THE UNITED STATES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

MATCH THE TERM TO THE NERC REGISTRATION

A

B -RC-THE HIGHEST LEVEL
C -GO-OPERATES GEN.
A -BA-BA AREA
D -TO-OWNS TRANSMISSION FACILITIES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

WHAT ARE THE ANCILLARY SERVICES BID INTO THE CAISO MARKET

A

REG. UP
REG. DOWN
SPIN
NON-SPIN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

WHAT ARE THE REQUIREMENTS FOR SPIN

A

C- MUST BE ONLINE, HAVE A GOV. THAT CAN RESPOND TO FREQ. EXCURSIONS,BE ABLE TO COMPLY 10 MIIN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

THE ENTITY RESPONSIBLE FOR MONITORING COMPLIANCE WITH RELIABILITY STANDARDS IN NORTH AMERICA IS

A

D- RELIABLE ENTITY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

LIST THE INTERCONNECTIONS IN NORTH AMERICA

A

WESTERN
EASTERN
TEXAS
QUEBEC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

DESCRIBE THE DIFFERENCE BETWEEN ENERGY AND CAPACITY

A

ENERGY IS CURRENT MW’S
CAPACITY IS AVAILABLE MW’S NOT BEING GENERATED.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

THE ENERGY IMBALANCE MARKET RUNS EVERY 15 MIN. AND IS SOMETIMES CALL THE 15 MIN. MARKET.

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

ELECTRICITY IS PRODUCED AND CONSUMED AT THE SPEED OF LIGHT WHICH CREATES CHALLENGES IN MAINTAINING BALANCE AND FREQUENCY

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

WHAT IS USED TO DISPATCH GENERATION TO MATCH LOAD

17
Q

LOSSES ARE CALCULATED BY THE USE OF THE NETWORK MODEL AND THE OPTIMUM POWER FLOW SOLUTION AND AFFECT LMP

18
Q

THE CAISO HAS 2 MARKETS

A

DAY AHEAD
REAL TIME

19
Q

THE MARKET CLEARING PRICE IS THE POINT WHERE THE BID PRICE MEETS THE DEMAND ARE EQUAL PRICE

20
Q

THE CONGESTION COMPONENT OF THE LMP IS CAUSED BY A LACK OF TRANSMISSION CAPACITY

21
Q

WHAT ARE THE THREE TRADING HUBS IN TODAYS ENERGY MARKET

A

NP15
SP15
ZP26

22
Q

WHAT ARE THE COMPONENTS OF LOCATIONAL MARGINAL PRICE

A

(ALL)
CONGESTION
LOSSES
ENERGY

23
Q

LIST THE NERC RULES FOR REGISTERING AS A GO/GOP

A

-GEN. UNITS >20MVA
-PLANT >75MVA
-GEN. BLACKSTART CAPABLE
-ANY GEN REGARDLESS OF SIZE APART OF THE BULK POWER SYSTEM

24
Q

RELIABILITY STANDARD EOP-004-3 REQUIRES US TO MAKE A REPORT TO DOE AND NERC FOLLOWING AN EVENT ON BES WHICH FIELD DIVISION HAS NO REPORTABLE BES FACILITIES AND EXPLAIN WHY

A

SJFD NO GENERATION OR BES TRANSMISSION FACILITIES/EQUIP.

25
OWNING OR OPERATING AN INTEGRATED TRANSMISSION ELEMENT ASSOCIATED WITH THE BPS 99KV AND ABOVE REQUIRES YOU TO REGISTER AS A (TO OR TOP)
FALSE
26
LIST 3 GENERATING PLANTS THAT CDWR OWNS THAT MEET NERC REQUIREMENTS
HYATT THERMALITO GIANELLI DC WARNE
27
NAME 2 TRANSMISSION LINES THAT DWR OWNS
MIDWAY-WHEELERRIDGE 1 AND 2 OROVILLE-THERMALITO-TABLE MOUNTAIN 1AND3 OROVILLE-TABLEMOUNTAIN #2
28
WHAT IS USED TO ENSURE YOU STAY WITHIN YOUR GENERATION CAPABILITIES
THE D CURVE
29
WHEN THE SYSTEM IS OVERGENERATING THE FREQ. IS _____ THAN 60HZ
HIGHER
30
HOW LONG DO WE HAVE TO COMPLY WITH LOAD DROPS
10 MIN
31
SPINNING RESERVE IS THE RESERVE CAPABILITY THT CAN BE CONVERTED TO ENERGY WITHIN 10 MIN.
TRUE
32
WHILE OPERATING A GENERATOR AND YOU NOTICE THE AVR IS IN MANUAL OR THE PSS IS NOT IN SERVICE YOU HAVE 1 HOUR TO NOTIFY
FALSE
33
GENERATOR OPERATORS MUST COMPLY WITH OPERATING INSTRUCTIONS UNLESS IT WOULD VIOLATE
SAFETY REGULATORY STATUTORY EQUIP. DAMAGE
34
WHAT OPERATING PROCEDURE IN DWR COMPLIES WITH FOLLOWING OPERATING INSTRUCTIONS
OP-25
35
DESCRIBE 3 PART COMMUNICATION
-ISSUER ISSUES -RECIEVER REPEATS -ISSUER CONFIRMS -REQUEST OF ISSUER TO REISSUE THE OPERATING INSTRUCTION
36
WHAT YEAR DID NERC CHANGE ITS NAME TO THE NORTH AMERICA ELECTRIC RELIABILITY CORPORATION
C-2007