Planning Flashcards
When can we consider runways to be separated?
Separate approach procedures based on separate approach aids.
If they cross, a blockage on one does not prevent the planned operation on the other.
When do we not need a destination alternate?
Flight < 6 hrs
Vis 5 km+
Ceiling 2000’ or circling +500 if greater
Two separate runways
When do we require two destination alternates?
If destination weather is unavailable.
If destination weather is below planning minima for +/- 1 hr.
Landing not assured at destination (wind component/runway state).
When planning for an alternate, the TAF indicates in a prob/tempo that the weather will be below limits. Can this alternate be used?
Yes, a prob/tempo can be disregarded.
What is the planning minima for a Take-off alternate?
At or above the minima for the expected instrument approach.
Any limitation related to one engine inop or dispatch under MEL shall be taken into consideration.
Within what distance must a cruise alternate be?
A319 - 380 nm
A320 - 400 nm
Within what distance must a Take-off alternate be?
1 hour still air flight time at 1 eng inop cruise speed
320 nm
What is the planning minima for a destination alternate if only a non-precision approach is available?
MDA +200’
RVR +1000m
How long is a tempo forecast expected to last?
Individually less than one hour each episode.
In aggregate, less than half the of the period specified.
How much extra fuel should be carried for LVP’s?
About half an hour (1000kg)
What is the min RFF category for departure, destination and alternates?
Departure/destination 4 (temp <72 hours)
Alternates non UK 4
Alternates UK 5