Q

Justification of location

A

Horton Kirby close to river system, train link, walking distance, local amenities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Risks

A

Working with water environment; slips and cuts and falls

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Three methods of data collection

A

River width, depth, sediment size

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

River width process

A

Distance between banks, define by erosion or deposition, measuring tape 3x sections (within 1/5 location) 1m apart, average derived

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

River depth process

A

Depth at each location, 3 measurements = 1x middle, 1x far bank, 1x near bank, reliable results

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Sediment size process

A

Large or small sediment found on bed, defined by abrasion or attrition, 8 sediment samples 3x per location, high data yield for reliability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Data presentation methods

A

Line graphs (correlation, line of best fit for pattern), cross profiles (illustrate width and depth per site, highlight external factors and anomalies)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How was data reliable?

A

5 sites along river for indicative data of whole, 3x depth and width measurements (reduce anomalies increase accuracy), 2 sediment samples (mean for reliability)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Improve

A

More sites over larger distances as sample size was too small not indicative, more accurate measuring equipment as tape was dragged by current (laser measures), go other times of year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Observations/ conclusion

A

Followed Bradshaw model (sediment size got smaller/ higher depth downstream), yet did not fit into model with width (narrower) due to external factors. Conclusions somewhat yet not entirely fit with project expectations