PEI RP 1200 Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities Flashcards
1
Q
What can visually indicate a test failure during integrity testing of a spill bucket? (PEI,
Section 6.3.4)
A
2
Q
How high should the test fluid level be when doing a hydrostatic test of a containment
sump? (PEI, Section 6.5.6 and Figure 6-7)
A
3
Q
Flow restriction and overfill alarms are required to engage when the tank gets _________full. (PEI, Section 7)
A
4
Q
When does an automatic shutoff device pass an inspection? (PEI, Section 7.1.7
A
5
Q
How does an ATG probe pass a functionality test? (PEI, Section 8.2.1.7)
A
6
Q
A