PEC CHAPTER 7 SPECIAL CONDITIONS Flashcards
EMERGENCY SYSTEMS
Test and Maintenance
Conduct or Witness Test - The ________ shall conduct or witness a test of the complete system upon installation and periodically afterward.
authority having jurisdiction
EMERGENCY SYSTEMS
Test and Maintenance
Tested Periodically - Systems shall be tested periodically on a schedule acceptable to the ________ to ensure the systems are maintained in proper operating condition.
authority having jurisdiction
EMERGENCY SYSTEMS
Test and Maintenance
Battery Systems Maintenance - Where battery systems or unit equipments are involved, including batteries used for starting, control, or ignition in auxiliary engines, the _________ shall require ________
authority having jurisdiction
periodic maintenance.
EMERGENCY SYSTEMS
Test and Maintenance
A _______ shall be kept of such tests and maintenance.
written record
EMERGENCY SYSTEMS
Test and Maintenance
Testing Under Load- Means for testing all emergency lighting and power systems during__________ conditions shall be provided.
maximum anticipated load
EMERGENCY SYSTEMS
Circuit Wiring
Wiring- __ or more emergency circuits supplied by the same source shall be permitted in the same raceway, cable, box, or cabinet. Wiring from an emergency source or emergency source shall be kept entirely _________ of all other wiring unless permitted in the ff:
Two
independent
- Wiring from the normal power source located in transfer equipment enclosure.
- Wiring supplied from 2-sources in exit or emergency luminaires.
- Wiring from 2-sources in a common junction box for emergency luminaires.
- Wiring containing only the branch circuit supplying a single unit equipment.
EMERGENCY SYSTEMS
Circuit Wiring
Wiring Design and Location - Shall be designed and located so as to_________ that might cause failure due to ____________________ (4)
minimize the hazards
flooding, fire, icing, vandalism, and other adverse conditions.
EMERGENCY SYSTEMS
Circuit Wiring
Fire Protection - Listed are the additional requirements for buildings with _____person or more or in buildings above _____m in height with the following occupancies: assembly, educational, residential, detention and correctional, business, and mercantile.
Feeder Circuit Wiring - Shall meet one of the following conditions:
- Be installed in spaces/areas that are fully protected and with an ________ automatic fire suppression system.
- Listed electrical circuit protective system with minimum of ___hr fire rating.
- Protected by a listed_______ system for the electrical system components.
- Protected by a _________ listed to achieve a fire rating of ______hr.
- Be embedded in not less than___mm concrete.
- Is a cable listed to maintain ______ for not less than ____hr
1000 persons
23 m
approved
1-hour
thermal barrier
fire-rated assembly / 1-hour
50 mm
circuit integrity / 1 hour.
EMERGENCY SYSTEMS
Sources of Power
Storage Battery - Shall be of suitable rating and capacity to supply and maintain the load for a minimum period of ______hrs, without the voltage to the load falling ___% of the normal.
1 ½ hours
87 ½
EMERGENCY SYSTEMS
Sources of Power
Generator Set
_________ A time-delay feature permitting a _______ shall be provided to avoid retransfer in case of short-time reestablishment of the normal source.
.
Prime Mover-Driven-
15-minute setting
EMERGENCY SYSTEMS
Sources of Power
Separate Service - Where acceptable to AHJ as suitable for emergency source additional service is permitted provided it has a ___________. And, service conductors sufficiently remote electrically and physically from any other service conductors.
separate service drop or service lateral
EMERGENCY SYSTEMS
Sources of Power
Unit Equipment - Shall be provided illumination consisting of the following: (4)
- A rechargeable battery
- A battery charging means
- One or more lamps mounted on the equipment.
- A relaying device arranged to energize the lamps automatically upon failure of equipment.
EMERGENCY SYSTEMS
Sources of Power
Generator Set
Battery Power and Dampers - Battery shall be equipped with an _______ means independent of the generator set. And, the damper used for ventilation of the genset must also be _________
automatic charging
connected to the emergency system
EMERGENCY SYSTEMS
Sources of Power
Generator Set
Internal Combustion as Prime Mover - An on-site fuel supply shall be provided sufficient for not less than ____________hrs operation of the system.
2 hours’ full demand
EMERGENCY SYSTEMS
Sources of Power
Generator Set
Auxiliary Power Supply - Generator sets that require more than ______secs to develop power shall be permitted if an auxiliary power supply energizes the emergency system__________.
10 seconds
until the generator can pick up the load