What is a change?

A

A deviation from an agreed well defiened scope and schedule

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How is an engineering change defined?

A
  1. An alteration made to a bill of materials by
    1. adding or deleting an item
    1. substituting an item with another, or
    1. changing the usage of an item.
  2. An alteration made in the functional, maintenance, performance, or physical characteristics of a product/system.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What reasons for a need of a changes do you know?

A

The need for a change can be caused by:

  • A change in the customers’ requirements
  • A change in material or manufacturing method.
  • Correction of a design mistake
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Which three roles are involved in the change management process?

A
  • Customer (ext./int.): requests a change
  • Change Manag. Committee: descides whether a change request will be implemented or not
  • Change builder: is the work package owner whom plans and implements the change
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is a change order request?

A

It’s a WRITTEN formal document to modify the original contractual agreement and becomes part of the projects documents.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which points are processed in the change request analysis?

A
  • Determine the safety relevance of the requested change
  • Determinetechnicalandorganisational feasibility
  • DetermineQCD impact
  • Decide whether or not requested change is executed
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is an Engineering Change Notice (ECN)?

A

Document which records a change to a specific design.

Control and documentation are necessary to ensure that changes are built upon a known foundation and approved by relevant authorities (change committee).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Which information must an Engineering Change Notice (ECN) contain at least?

A
  • Identification of what needs to be changed
  • Reason(s) for the change.
  • The QCD impact of the change
  • Description of the change
  • List of documents affected by the change
  • Approval of the change
  • Instruction about when to introduce the change
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is Configuration Management (CM)?

A

A process for establishing and maintaining product integrity and consistency in the product documentation during the life cycle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Example Airbus A320 Family.

A

System level 0 - Family:
A320 base model
A319 and A318 shrinked
A321 streched in lenght

Each variant has specific realization details that must be carefully documented.

Subsystem level 1:
every model has its adjusted subsystem (e.g. engine A320-111)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the target of Configuration Management?

A

It ensures that it is clear how a product is currently configured and how it was configured in the past.