P02 Product Design and Development Constrains Flashcards
What are the 3 constraints within a project, often presented as a triangle?
Design and development projects must
- be delivered within cost,
- be delivered on time,
- meet customer quality requirements
The triple constraint is about balancing each constraint to reach a successful conclusion
What is the “old way” and the “new way” of working?
old:
exclusively department oriented
new:
matrix organization
(project responsibility x functional responsibility)
What is a matrix organization?
It’s an organization structure, that combines
projectized organization structure and
functional organization structure.
What is a main advantage of the matrix organization in respect to realization of several projects?
It enables better resource use from the aspect of the company as a whole.
As needed resources are available for a period, this enables the optimization of using resources of the whole company.
In case of several projects, the availablility of experts for all departments to all projects reduces drastically the multiple resource use!