Organizational Goals and Lean Principles in the Organization Flashcards
A process that is considered best in class will operate at 6 sigma
False
Deming believed that organizations should move
away from numerical quotas and numerical goals for management.
True
The original Six Sigma methodology consisted of
all phases except
Measure
Analyze
Control
Define
Define
Cost reduction projects can result in all except
Lower product lifetime
Customer defections
Pleased customers
Lower reliability
Pleased customers
In the control phase of DMAIC, our prime
objective is to
Develop the solution
Implement the solution
Ensure the problem stays fixed
Close the project
Ensure the problem stays fixed
Six sigma can reduce the number of botched
surgical procedures from 5000 every week to
1.7 botched procedures every month
3.4 botched procedures every week
833 botched procedures every week
1.7 botched procedures every week
1.7 botched procedures every week
*Six Sigma quality performance means 3.4
defects per million opportunities
Before analyzing and improving a process, we
must first ensure
The process is stable
Management knows what we are doing
We know how much money we will save
Who is responsible for the issue
The process is stable
The father of quality engineering is
There is no father of quality engineering
Deming - plan–do–check–act (PDCA) cycle
Juran - Pareto principle (80/20)
Taguchi
Deming
Juran
Taguchi (Correct)
The six sigma methodology was first advanced by
Harry and Lloyd
Siegel and Shuster
Harry and Smith
Simon and Garfunkel
Harry and Smith
An important step in developing a process flow
is
Walking the process
Creating a work instruction
Making the scope as inclusive as possible
Creating the perfect flowchart the first time
Creating the perfect flowchart the first time
After WWII, Japanese manufacturers develop their
philosophy, drawing on the ideas of Deming, Juran, and Henry Ford.
True
Lean is a collection of tools, from which you
can pick and choose the ones you like.
False
*Lean tool = process control
When documenting the value stream, what are the
boundaries?
From the receiving dock to the shipping dock
It may vary depending on the company
From suppliers’ suppliers to customers’ customers
From direct suppliers to direct customers
From suppliers’ suppliers to customers’ customers
*A value stream is the series of activities that an organization performs, such as order, design, produce, and deliver products and services.8
Large batch sizes are generally more efficient.
False
Gembas refers to:
The Real Place
Policy Deployment
Work Leveling
Autonimation
The Real Place