Organizational Goals and Lean Principles in the Organization Flashcards

1
Q
A process that is considered best in class will
operate at 6 sigma
A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Deming believed that organizations should move

away from numerical quotas and numerical goals for management.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The original Six Sigma methodology consisted of
all phases except

Measure
Analyze
Control
Define

A

Define

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Cost reduction projects can result in all except

Lower product lifetime
Customer defections
Pleased customers
Lower reliability

A

Pleased customers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

In the control phase of DMAIC, our prime
objective is to

Develop the solution
Implement the solution
Ensure the problem stays fixed
Close the project

A

Ensure the problem stays fixed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Six sigma can reduce the number of botched
surgical procedures from 5000 every week to

1.7 botched procedures every month
3.4 botched procedures every week
833 botched procedures every week
1.7 botched procedures every week

A

1.7 botched procedures every week
*Six Sigma quality performance means 3.4
defects per million opportunities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Before analyzing and improving a process, we
must first ensure

The process is stable
Management knows what we are doing
We know how much money we will save
Who is responsible for the issue

A

The process is stable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The father of quality engineering is

There is no father of quality engineering
Deming - plan–do–check–act (PDCA) cycle
Juran - Pareto principle (80/20)
Taguchi

A

Deming
Juran
Taguchi (Correct)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The six sigma methodology was first advanced by

Harry and Lloyd
Siegel and Shuster
Harry and Smith
Simon and Garfunkel

A

Harry and Smith

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

An important step in developing a process flow
is

Walking the process
Creating a work instruction
Making the scope as inclusive as possible
Creating the perfect flowchart the first time

A

Creating the perfect flowchart the first time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

After WWII, Japanese manufacturers develop their

philosophy, drawing on the ideas of Deming, Juran, and Henry Ford.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Lean is a collection of tools, from which you

can pick and choose the ones you like.

A

False

*Lean tool = process control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When documenting the value stream, what are the
boundaries?

From the receiving dock to the shipping dock
It may vary depending on the company
From suppliers’ suppliers to customers’ customers
From direct suppliers to direct customers

A

From suppliers’ suppliers to customers’ customers
*A value stream is the series of activities that an organization performs, such as order, design, produce, and deliver products and services.8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Large batch sizes are generally more efficient.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Gembas refers to:

The Real Place
Policy Deployment
Work Leveling
Autonimation

A

The Real Place

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

In a Lean system, any employee has the authority

to stop production if a quality problem is seen

A

True

17
Q

When applying Theory of Constraints, the most

important thing is managing the bottleneck.

A

True

18
Q

Which of the following is a tool for workplace
organization

5S
TPM - Total Productive Maintenance
Andon - Signal
SMED - Single-Minute Exchange of Dies (Cycle time deduction)

A

5S (correct)
TPM
Andon
SMED

19
Q

Which of the following enables an organization
to quickly change from one part number to another?

5S
Andon
TPM
SMED

A

SMED

20
Q

If a process has availability of 0.95,
performance of 0.96, and quality of 0.94, what is the OEE (Overall Equipment Effectiveness)?

  1. 96
  2. 94
  3. 95
  4. 86
A

0.86
*OEE = Availability (Available hours) × Performance efficiency
(Proportion of production flow to operating time) ×
Rate of quality products (output) (Percentage yield of acceptable
products to total units produced)