North/South Divide Flashcards

1
Q

South West ‘Super Highway’

………. = main route to South West

Traffic flow = slow (alternating stretches of dual + single carriageway)
Peak times = heavily congested

£…. billion …………………….project - biggest over next …. years

  • Hundreds of construction jobs
  • Converting route to …………………..
    • improvements to ……………………
  • ‘Super Highway’ to …………… and beyond
A

A33

£2 billion

  • Converting route to dual carriageway
  • Improvements to connecting routes
  • ‘Super Highway’ to Exeter and beyond
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

New Road Improvements:

  • ……………………………… in North (dualling A66 between A1)
  • ……………………………… e.g construction of additional lanes to reduce congestion + use of SMART MOTORWAY technology
  • ‘……………………………………’ (2020-25) - £……. billion
  • ‘……………………………………’ (2015-2020) - £….. billion

aims to create thousands of jobs - 2
aims to increase capacity and improving road conditions - 1

Future Road Schemes:

  • …………….+…………… of bridges + safety barriers and resurfacing of roads
    -Improving connectivity - ……+ projects (2020 - 24) —> M42 link to Birmingham airport and A39 to Cornwall
  • Increasing motorway capacity between Midlands and South East + better A4 link between port of Felixstowe and Midlands/North
A
  • Increased connectivity in North
  • Improving road design
  • Road Investment Strategy 2 - £27 billion +
  • Road Investment Strategy 1 - £15 billion +
  • Maintenance + repair of bridges
  • 50 + projects
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Railway Improvements

HS2 = £…….billion - high speed rail to connect …………… with ……………… then to ………………….

Electrification of …………………… route between ……………….,……….. and ……….. - reduce travel time by up to ……. minutes

…………………. in Leeds and Exeter + improvements to port of Southampton and Midlands

London’s Crossrail

Across capital links - …………….and…………….. to ……………….and…………….
-£……billion

…….. passengers/year with ………… passengers per train

Improve journey times across London + easing congestion and offering better connections to underground + rest of UK/Europe - ……..million within ………minutes commuting distance of London’s key business districts

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Railway improvements

Leeds to get £……..million to plan tram or other transit system

Midlands main line between London st Pancreas, the East Midlands and Sheffield = fully electrified

A

200

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Airports:

  • Aviation centre = annual turnover of £…….billion +

Uk’s airports handle about …….million tonnes of freight/year

Contributes £…. billion to UK’s GDP + 1 million jobs

Heathrow airport = new runway - £…….billion + open in 2029
- boost regional economy by £….. billion and create ………….local jobs

BUT

………………….
During construction - ……………………,………………….and M25 ……………………
……………………………….(Entire village of Longford)

UK’s busiest airport - handles …….million passengers /year - 4 terminals + 2 runways

A

60 billion

2.5 million tonnes of freight

18.6 billion

61 billion + 77000 jobs

BUT

Noise pollution
Rivers diverted + roads moved - M25 re-routed through a tunnel

80 million passengers/year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly