Module 8 Flashcards
1
Q
Mitigation options
A
Prune to remove or reduce loads on parts likely to fail Cable, brace, prop Remove tree Modify site to improve conditions Tree growth regulators
2
Q
Extreme risk, high risk, moderate risk, low risk
A
Asap, as soon as work allows, retain and monitor, mitigate, if desired.
3
Q
Residual risk
A
Risk remaining after mitigation