MDM Flashcards

1
Q

Choose three scenarios where Dynamic Option can be applied [Verified in slides. Fundamentals: Dynamic Option]

A
  • The utility has a program that credits customers for conservation during critical peak periods (CPP)
  • The utility has a program where customers can optionally participate in demand response (DR) programs:
  • A consumer receives a credit for consumption during a CPP event that is lower than their “normal” consumption
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

On what zone does work list icon appears [Verified in exercises]
Choices
- Map
- Explorer
- Standalone
- Query

A

Explorer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where is Service Provider associated [Verified in slides]
Choices
- Device Type
- Device Configuration Type
- Usage Subscription Type
- Service Point Type

A

Device Type, Usage Subscription Type

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

how to communicate with external system? (parang may something bill determinants ung tanong kaya usage subscription ung sagot ko)

A

My Answer: Usage Subscription
Bene’s answer: Service Provider

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Give two primary definition for Usage Transactions

A
  • Push for bill determinants from the subscribing systems
  • Pull for bill determinants to the subscribing systems
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Choose three calculation types of Apply Math Usage Rule [Verified in Apply Math Algorithm]

A
  • Single Value
  • Math Function
  • Mathematical Expression
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What best describes TOU Map Template SPI [verified in the slides: Fundamentals Time of Use Map]

A

A TOU template’s interval size (SPI) controls the values allowed in the Start and End Times.
A template can be used to generate TOU data for TOU maps whose SPI divides evenly into the template’s SPI.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A scenario wherein TOU data should be generated. Where holiday consumption should be categorized as Off-Peak regardless of the day it falls on [verified on the slides Fundamentals TOU Map]

Choices
- Add work Calendar in the TOU Map Template and mark Holiday as off-peak
- Edit TOU Map Template to mark Holiday as “off-peak”
- Add work Calendar in the TOU Map Template and mark Holiday as off-peak

A
  • Add work Calendar in the TOU Map Template and mark Holiday as off-peak
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

If TOU Map template is described as “controls the values allowed in the Start and End Times
A template can be used to generate TOU data for TOU maps whose SPI divides evenly into the template’s SPI”.
Choose the best choice on what possible TOU data will be generated by the TOU Map template with 60 SPI value [verified In fundamentals TOU Map]
Choices
- TOU Map template can only generate 60 minute TOU data
- TOU Map template can generate 60 minutes TOU data and 120 minutes TOU data
- TOU Map template can generate 60 minutes TOU data and 1440 minutes TOU data
- TOU Map template can generate 60 minute, 30 minute, 15 minute, 5 minute TOU data

A
  • TOU Map template can generate 60 minute, 30 minute, 15 minute, 5 minute TOU data
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

10) Consider a rate that has different prices depending on:
a. The season of the year (winter, spring, summer, fall)
b. The time of day (peak, off-peak, shoulder)
c. The actual temperature as compared to the historic average (normal, hotter, colder)
How many TOU codes need to be set-up? [Verified on Fundamentals TOU Map]

A

This rate would require 36 TOU codes (4 seasons * 3 time of days * 3 temperature bands)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When is consumption aggregated? [Verified on Fundamentals: Aggregation]
- The system periodically aggregates consumption in batch (using a deferred monitor on the aggregator MCs)
- Users can re-aggregate real-time if they can’t wait or if the original aggregation needs to be redone due to incorrect admin or master data
- Users can create ad hoc aggregations “on the fly” and these will persist in the database
- Aggregation typically lags the current date by a few days to give the system time to upload and VEE the consumption; the amount of lag time is configured by the implementation
- Aggregation is always performed through a given “through time” (e.g., 12am) rather than through the time of aggregation

A
  • The system periodically aggregates consumption in batch (using a deferred monitor on the aggregator MCs)
  • Users can re-aggregate real-time if they can’t wait or if the original aggregation needs to be redone due to incorrect admin or master data
  • Users can create ad hoc aggregations “on the fly” and these will persist in the database
  • Aggregation typically lags the current date by a few days to give the system time to upload and VEE the consumption; the amount of lag time is configured by the implementation
  • Aggregation is always performed through a given “through time” (e.g., 12am) rather than through the time of aggregation
  • Note: Exam only ask you to choose 4 correct answers. The incorrect choice is “Users can create ad hoc aggregations “on the fly” and these will NOT persist in the database“
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

There would be plenty of Head-End system to be used by MDM. All with Manufacturer XYZ but models may be different for each Head-End System. Which option should be taken in order for the implementation team to minimize future enhancement?

A

Model Number

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which measuring component type should reference a device configuration
Choices:
- Physical
- Standalone
- Scratchpad
- Aggregator

A

Physical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which item below best describes the goal for selecting ‘Maximum’ as the comparison method for the High/Low validation rule?
Choices:
- To identify intervals with suspiciously high usage relative to surrounding intervals.
- To identify if a configurable percentage of missing measurements exceeds the specified percentage.
- The rule compares the Average Daily Usage of the current Initial Measurement Data with the Average Daily Usage for historical measurements.
- The rule compares the Peak Usage of the current Initial Measurement Data with the Peak Usage for historical measurements.

A

The rule compares the Peak Usage of the current Initial Measurement Data with the Peak Usage for historical measurements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which validation rule calculates the difference between the highest interval and the third highest interval to determine the percent difference between the two?
Choices:
- High/Low Validation
- SPI Check
- Interval Spike Check
- Raise Missing Quantity
- High/Low Validation and Interval Spike Check

A
  • Interval Spike Check
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which of the following are is an example of a critical validation performed by the IMD Seeder Business Object?
Choices:
- Performing a Spike Check
- Deriving the head-end system and the measuring component
- Performing a High Low Check
- Estimate Missing Intervals

A

Deriving the head-end system and the measuring component

17
Q

17) Which is the bare minimum requirement in uploading an IMD XML:
Choices:
- mcIdN
- dvcIdN
- serviceProvider
- mcId
- serviceProviderExternalId

A

mcId

18
Q

How will you configure additional Final Values Overlay Profiles
Choices:
- Business Object
- Feature Configuration
- Extendable Lookup

A
  • Extendable Lookup
19
Q

A scenario wherein a 1st device event was received which is waiting for the 2nd device event. Which BO is associated to the 1st device event:
Choices:
- D1-PairedEventFirstDeviceEvent
- D1-PairedEventLastDeviceEvent

A

D1-PairedEventFirstDeviceEvent

20
Q

A scenario with Daylight Savings Time. Where can you configure Incoming Data Shift?
Choices:
- Device Type
- Service Point
- Usage Subscription Type
- Measuring Component Type

A

Device Type

21
Q

Which BO performs critical validations on initial measurement data?

A

D1-IMDSeeder

22
Q

A question asking what are the VEE Group Roles?

A

Initial Load, Estimation, Manual Override

23
Q

How can you ensure that a VEE Rule will be executed..?

A

Configure a fallback VEE Group

24
Q

Scenario on Interval Spike Check
Client wants the following:
• Trigger Spike check…
• If there is a spike exception, the interval that cause it will be filled up by estimation VEE rule.
• All missing measurements will also be fill up by estimation VEE rule.

Given Table:
Date/Time Measurement
01/01 03:00 PM 13.XX
01/01 04:00 PM Missing
01/01 05:00 PM 14.XX
01/01 06:00 PM 150.XX

Select only two that will be an output of the given scenario after the VEE Rule (as per client’s specification) is executed.

A

NOTE:
There will be five choices stating different date/time and their corresponding condition code after the VEE Rule is executed.

My Answers:
1. 01/01 04:00 PM will be estimated
2. 01/01 06:00 PM will be estimated

25
Q

Choose two best answer: Question about the usage of service point/measurement cycle relationship.

A
  1. Initiate manual meter reading…
  2. Initiate push of bill determinants…
26
Q

Choose the best answer: What relationship between the external system and MDM is needed to be defined before creating Usage Transaction / Bill Determinants?

A

Usage Subscription

27
Q

Choose the best answer: Define the relationship between final measurements and derived values.

A

Final measurements can have multiple derived values…

28
Q

Choose the 1 answer: How many derived values can be stored the final measurement.

A

10

29
Q

Choose the best answer: A scenario about a client specification on a usage calculation which should result a “Grand Total” of each UOM and TOU combination.

A

Service Quantity Math

30
Q

Choose the 3 types of VEE Exception.

A
  1. Information
  2. Issue
  3. Terminate
31
Q

Choose the 2 answers: What are defined in Usage Subscription Type?

A
  1. Valid Usage Recipients
  2. Valid Service Point Type
32
Q

Choose the 4 answers: What items can be aggregated?

A
  1. Substation and Feeder
  2. Postal Code
  3. Transformer
  4. Unit of Measure
33
Q

Choose the 1 answer: How many Service points can be link to a Usage Subscription?

A

Unlimited

34
Q

Choose the 1 answer: MDM Object that is associated with Device Events.

A

Activities

35
Q

Choose the 1 answer: A scenario where an IMD is created but is not yet finalized. Measurements of that IMD has passed what kind of checking?

A

Critical Validation

36
Q

Choose the 2 answers: A scenario where there is a given two types of MC, which executes a similar VEE Group, but only one of the two MC should execute Negative Consumption Check. Question: What is the best way to implement this?

A
  1. …use eligibility criteria…
  2. …use factors…
37
Q

Choose the one answers: A scenario where an IMD is manually loaded. How do you finalized it?

A

Go to IMD Page and click Perform Additional Mapping.