Masonry(BB-CH8) Flashcards

1
Q

To smooth cut a concrete masonry unit, use which of the following tools?

A

a brick chisel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

To finish a masonry joint, use which of the following tools?

A

jointer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When placing masonry units, use a steel square for which of the following jobs?

A

laying out crowns

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

(True or False) There are three main types of concrete masonry units.

A

false

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Load-bearing concrete block used in above and below grade exterior walls that may or may
not be exposed to moisture should be what grade?

A

grade n

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A standard concrete masonry unit made with pumice has what approximate weight?

A

25-35 pound

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The sides and the recessed ends of a concrete block are called the

A

shell

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

(True or False) Spreading a 1 inch layer of mortar on both bed joints of walls and columns
is called face shell mortar bedding.

A

false

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

For above grade exposed masonry where high compressive and lateral strength is not
required, use what type of mortar?

A

type N

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

You should not temper mortar that has been mixed longer than what maximum time?

A

2 1.2 hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

(True or False) You should only add calcium chloride should to mortar if it is specified in
the specifications.

A

true

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Using standard block, how many courses are required for a concrete block wall 10 feet
high?

A

15

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

To lay 600 square feet of wall, you need approximately how many (a) 8 by 4 by 12 inch
concrete blocks and (b) cubic feet of mortar?

A

900; 24

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When bags of cement or lime are stacked on pallets, a setback should begin at what tier?

A

sixth

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

A concrete block should be laid with what portion up?

A

The thicker end of the face shell

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What part(s) of a block wall is/are laid immediately after the first courses?

16
Q

During the construction of a concrete block wall, you must butter all vertical edges of a
block at what point?

A

When the closure block is being installed

17
Q

Any excess mortar remaining on a concrete block after the joints are tooled should be
removed by what method?

A

rubbing with a burlap bag

18
Q

Intersecting bearing walls should be tied together by what means?

A

metal tie bars bent at right angles

19
Q

Lintel blocks should extend past the edge of an opening to what minimum distance?

20
Q

When reinforcing a block wall, you can ensure proper alignment of the rebar by performing
what action?

A

Placing a cleanout block at every stud in the first course

21
Q

(True or False) Weep holes in retaining walls are used to prevent water accumulation
behind the wall.

22
Q

For masonry structures that can withstand high temperatures without cracking or
decomposing, you should use what type of brick?

23
Q

(True or False) In masonry, a soldier is a row lock brick laid with its bed parallel to the face
of the wall.

24
In brick walls, structural bonding takes place by what means?
all of the above
25
The pattern formed by the masonry units and mortar joints on the face of a wall is called what type of bond?
pattern
26
Which of the following bonds is a variation of the running bond in which a header course appears at the fifth, sixth, or seventh course?
common/american bond
27
Moisture is prevented from seeping under a horizontal masonry surface by the installation of
flashing
28
Water that accumulates on a flashing should be allowed to drain to the outside by what means?
weep holes
29
To ensure a good bond between mortar and brick, avoid which of the following joints?
slushed
30
Spread bed joint mortar what maximum number of bricks ahead?
5
31
To cut a brick to an exact line with a brick chisel or brick set, follow which of the following procedures?
all of the above
32
(True or False) When laying out a brick arch, you can make the key brick line up by using an even number of bricks.
false