M200 Deck Flashcards
The time it takes a march element to pass a given point is:
Pass Time
Of all the division planning elements, ___ and ___ are more important.
of routes and lift assets
True or false
Serial is the smallest element of convoy
F
4 - True or false
Distance = Time * Rate of Speed
T
- True or false
Rate of Speed = Distance / Time
T
True or false
Time = Distance / Rate of Speed
T
True or false
Distance = Rate x Time
T
What shows vehicles organized into a unit with dates and time, and includes
routes, checkpoints, and stops
Road Movement Table
The Army is responsible clearing the unit off the APOD tarmac and providing
logistics support for transitioning units.
T
Who is ultimately responsible for RSOI?
Supported Combatant Commander
Unity of Command, Synchronization, Unit Integrity and Balance are Army
principles of RSOI
T
What type of area is established outside of the JOA and supports JRSOI?
Intermediate Staging Base
Why would you establish a ISB to support JRSOI?
Have a secure location to project the force for delivery of combat power
An example of Balance as a principle for JRSOI is an adjustment of the timephased force and deployment data (TPFDD)
T
Which principle of JRSOI links deployed personnel, equipment, and materiel
in time?
Synchronization
- True or false
Unity of Command is a unity of effort under one commander for each
objective/major task.
T
The Army pre-positioned stock that focuses major end items replacement
due to combat loss is
Army war reserve sustainment stocks
Which service component command is primarily responsible for setting the
theater and setting the JOA?
Army
Key tasks in theater opening are:
Establish PODs, build sustainment infrastructure and distribution systems
____’s mission is to rapidly deploy and operate APOD and SPODs, establish
distribution nodes, and facilitate throughput.
Joint Task Force - Port Opening (JTF-PO)
What best describes the theater distribution’s physical network?
The means (rail, pipe, etc) for distribution and their capabilities
Examples of _____ are: sustainment, air and missile defense, engineering,
information collection, and communications
Setting the Theater
The ASCC shifts from ‘Set the Theater’ to ‘Set the JOA’ when:
A GCC priorities shift to a specific nation or AO
Force closure is when a force is complete with movement and are ready for
their mission.
T
___ is the combatant commander assigning the ASCC with lead Service
responsibility for common user logistics or services
Directive Authority for Logistics
The process of receiving, offloading, marshalling, and transporting personnel
equipment
Reception
Assembling, temporarily holding, and organizing arriving personnel,
equipment, and material into units and forces is ___
staging
Integration is complete when C2 is established and ______
The unit can perform its assigned mission
When are units the most vulnerable during the JRSOI process?
Deployment movement prior to force closure
SDDC is the single port manager for all seaports worldwide on behalf of
USTRANSCOM
T
____ is when where forces transit from marshalling or staging areas to tactical
assembly areas
onward movement
The army is responsible for clearing the unit off the apod and providing logistics support for transitioning units
t
The ASCC shifts from set the theater to set the joa whjen
a GCC priorities shift to a specific nation or AO