LSA Flashcards

1
Q

How often are Fall Wires replaced?

A

As required, but a period not exceeding 5 years.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How often are Fire and Abandon Ship Drills Carried out?

A

Weekly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How much LSA is carried onboard Cargo and Pax ships respectively?

A

Cargo 200% (100% Lifeboats and 100% Liferaft)
Pax 150% (50% Lifeboat either side and 25% Liferaft)

*on cargo ships if over 100m LR at the bow - manual release

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the time for abandoning a ship Cargo and Pax?

A

Cargo - 10 mins from Abandon Ship Signal

PAX - 30 mins from Abandon Ship Signal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How would you recover persons from the water on a high sided vessel?

A

I would mobilise the - SOLAS - Recovery of Persons from the Water Plan.

Quite often there will be dedicated equipment onboard to comply with this - such as a spare Life Raft.

The recovery of persons from the water plan is ship specific. Under SOLAS Ch3 Reg 17. And required by the CSSE Cert

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What does your emergency Generator Power?

A
Emergency Lighting 
Nav Lights
GMDSS Equipment
Nav Equipment
Emergency Steering
A Fire Pump
Fire Detection and Alarms
Fire Doors (Holding and Release Systems)
RESTORE PROPULSION WITHIN 30MINS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How long is the emergency generator required to run Per SOLAS for PAX and CARGO respectively?

A

PAX 36hrs

CARGO 18hrs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How long should it take for the Emergency Generator to Start

A

45s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly